Installation, Start-up, and Operating Instructions
Deluxe | 355MAV |
| Series F |
Condensing Gas Furnace |
|
ama
CERTIFIED ®
As an ENERGY STAR® Partner, Bryant Heating
&Cooling Systems has determined that this product meets the ENERGY STAR® guidlines for energy efficiency.
REGISTERED QUALITY SYSTEM |
|
NOTE: Read the entire instruction manual before starting the installation. |
|
TABLE OF CONTENTS |
|
SAFETY CONSIDERATIONS | 3 |
INTRODUCTION | 3 |
CODES AND STANDARDS | 3 |
ELECTROSTATIC DISCHARGE (ESD) PRECAUTION PROCEDURE | 6 |
APPLICATIONS | 6 |
General | 6 |
Upflow Applications | 7 |
Condensate Trap Location | 7 |
Condensate Trap Tubing | 7 |
Condensate Trap Location (Alternate Upflow Orientation) | 7 |
Condensate Trap Tubing (Alternate Upflow Orientation) | 8 |
Condensate Trap Field Drain Attachment | 9 |
Pressure Switch Tubing | 9 |
Upper Collector Box and Inducer Housing (Unused) Drain Connections | 9 |
Condensate Trap Freeze Protection | 9 |
Downflow Applications | 9 |
Condensate Trap Location | 9 |
Condensate Trap Tubing | 10 |
Condensate Trap Field Drain Attachment | 11 |
Pressure Switch Tubing | 11 |
Condensate Trap Freeze Protection | 11 |
Horizontal Left | 11 |
Condensate Trap Location | 11 |
Condensate Trap Tubing | 11 |
Condensate Trap Field Drain Attachments | 12 |
Pressure Switch Tubing | 12 |
Condensate Trap Freeze Protection | 12 |
Construct a Working Platform | 12 |
Horizontal Right | 13 |
Condensate Trap Location | 13 |
Condensate Trap Tubing | 13 |
Condensate Trap Field Drain Attachment | 14 |
Pressure Switch Tubing | 14 |
Condensate Trap Freeze Protection | 15 |
Construct a Working Platform | 15 |
Form: II | Cancels: New | Printed in U.S.A. | Catalog No. |