Bryant 355MAV ControlCenter, EACTerminals on Control Center, B. Combustion-Airand Vent Piping

Models: 355MAV

1 60
Download 60 pages 27.74 Kb
Page 29
Image 29
Fig. 31—Control Center

EAC-ELECTRONIC AIR CLEANER TERMINALS (115-VAC 1 AMP MAX)

HOT SURFACE

IGNITOR CONNECTOR

115-V CONNECTORS

 

 

 

PRESSURE SWITCH

 

 

HUM

CONNECTOR

MAIN BLOWER

 

HUM-HUMIDIFIER

 

 

CONTROL WIRE

 

G

TERMINAL

CONNECTOR

 

R

(24-VAC 0.5 AMP MAX)

 

 

Y/Y2

24-V THERMOSTAT

 

 

W/W1

TERMINALS

 

 

 

 

 

COM 24V

DEHUMIDIFY ENABLE (DE)

 

 

W2

 

TRANSFORMER

 

 

 

 

 

24-V CONNECTORS

 

DEHUMIDIFIER (DEHUM)

 

 

 

CONNECTOR

 

 

 

3-AMP FUSE

 

STATUS AND DIAGNOSTIC

 

LED LIGHTS

 

AIR CONDITIONING

CONTINUOUS

(A/C) SETUP SWITCH

FAN (CF) SETUP

SETUP SWITCHES

SWITCHES

(SW) AND BLOWER

 

OFF DELAY SETUP

 

SWITCHES

 

MODEL PLUG

COMMUNICATION

 

CONNECTOR

 

A99097

Fig. 31—Control Center

Fig. 32—EAC Terminals on Control CenterEAC1

EAC2

A93053

Fig. 32—EAC Terminals on Control Center

4.Follow the lighting instructions. Place the appliance being inspected in operation. Adjust thermostat so appliance shall operate continuously.

5.Test for draft hood equipped appliance spillage at the draft hood relief opening after 5 minutes of main burner operation. Use the flame of a match or candle.

6.After it has been determined that each appliance connected to the venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers, and any other gas-burning appliance to their previous conditions of use.

7.If improper venting is observed during any of above tests, the venting system must be corrected.

Vent system or vent connectors may need to be resized. For any other appliances when resizing vent systems or vent connectors, system or connector must be sized to approach minimum size as determined using appropriate table found in the NFGC or NSCNGPIC.

B. Combustion-Air and Vent Piping

GENERAL

Combustion-air and vent pipe, fittings, primers, and solvents must conform to American National Standards Institute (ANSI) standards and American Society for Testing and Materials (ASTM) standards. See Table 6 for approved materials for use in the U.S.A. See Table 7 for maximum pipe lengths and Fig. 39, 40, 41, 42, and 43 for exterior piping arrangements.

In Canada, construct all combustion-air and vent pipes for this unit of CSA or ULC certified schedule-40 PVC, PVC-DWV or ABS-DWV pipe and pipe cement. SDR pipe is NOT approved in Canada.

—29—

Page 29
Image 29
Bryant 355MAV instruction manual ControlCenter, EACTerminals on Control Center, B. Combustion-Airand Vent Piping, General