Manuals
/
Bryant
/
Household Appliance
/
Furnace
Bryant
355MAV instruction manual Book/Tab 1/6, Catalog No
Models:
355MAV
1
60
60
Download
60 pages
27.74 Kb
53
54
55
56
57
58
59
60
<
>
Install
UnitWiring Diagram
Dimension
A. 115-VWiring
PROCEDURE 2-UPFLOWAPPLICATIONS
Checklist
Safety
C.Accessories
F. Pressure Switch Tubing
Page 60
Image 60
© 2002 CAC/BDP 7310 W. Morris St., Indianapolis, IN 46231
355m4011
Book/Tab: 1/6
Catalog No.
5335-518
—60—
Page 59
Page 60
Image 60
Page 59
Contents
TABLE OF CONTENTS
Installation, Start-up,and Operating Instructions
Deluxe 4-WayMultipoise
355MAV
General
SAFETY CONSIDERATIONS
Fig. 1-MultipoiseOrientations
INTRODUCTION
CODES AND STANDARDS
Dimensions in
Fig. 2-DimensionalDrawing
Fig. 3-Clearancesto Combustibles
INSTALLATION
ELECTROSTATIC DISCHARGE ESD PRECAUTION PROCEDURE
APPLICATIONS PROCEDURE 1-GENERAL
Fig. 4-CondensateTrap
Fig. 5-Factory-ShippedUpflow Tube Configuration
Shown with Blower Access Panel Removed
PROCEDURE 2-UPFLOWAPPLICATIONS
h.Attach tube to coupling and clamp securely
F. Pressure Switch Tubing
PROCEDURE 3-DOWNFLOWAPPLICATIONS
Fig. 7-DownflowTube Configuration
Left-HandTrap Installation
Fig. 8-DownflowTube Configuration
Right-HandTrap Installation
B. Condensate Trap Tubing
D. Pressure Switch Tubing
C.Condensate Trap Field Drain Attachment
E. Condensate Trap Freeze Protection
A. Condensate Trap Location
Fig. 9-HorizontalLeft Tube Configuration
C. Condensate Trap Field Drain Attachments
F. Construct a Working Platform
D. Pressure Switch Tubing
Fig. 10-AtticLocation and Working Platform
A. Condensate Trap Location
B. Condensate Trap Tubing
Fig. 11-HorizontalRight Tube Configuration
C. Condensate Trap Field Drain Attachment
D. Pressure Switch Tubing
LOCATION PROCEDURE 1-GENERAL
Fig. 12-FurnaceLocation for Proper Condensate
Drainage
Fig. 13-Return-AirTemperature
Fig. 14-ProhibitInstallation on Back
PROCEDURE 2-LOW-FIREONLY INSTALLATION
Fig. 15-FreezeProtection
PROCEDURE 4-HAZARDOUSLOCATIONS
Fig. 16-Installationin a Garage
INSTALLATION PROCEDURE 1-LEVELINGLEGS IF DESIRED
1.Size gas piping based on the high-fireinput
Table 1-OpeningDimensions in
Fig. 17-LevelingLegs
Fig. 18-Floorand Plenum Opening Dimensions
Fig. 19-Furnace,Plenum, and Subbase Installed
on a Combustible Floor
Fig. 20-Furnace,Plenum, and Coil Assembly or
Coil Box Installed on a Combustible Floor
PROCEDURE 4-AIRDUCTS A. General Requirements
Fig. 21-DuctFlanges
Fig. 22-CrawlspaceHorizontal Application
B. Ductwork Acoustical Treatment
C. Supply Air Connections
UPFLOW FURNACES
PROCEDURE 5-FILTERARRANGEMENT
Fig. 23-FilterInstalled for Side Inlet
PROCEDURE 6-BOTTOMCLOSURE PANEL
PROCEDURE 7-GASPIPING
Fig. 24-BottomFilter Arrangement
Fig. 25-RemovingBottom Closure Panel
171⁄2-IN.WIDE CASINGS ONLY
Table 3-MaximumCapacity of Pipe
Fig. 26-TypicalGas Pipe Arrangement
PROCEDURE 8-ELECTRICALCONNECTIONS
A. 115-VWiring
Fig. 28-DisconnectSwitch and Furnace
B. 24-VWiring
C.Accessories
Table 4-ElectricalData
PROCEDURE 9-DIRECTVENTING
Fig. 29-Relocating J-Box
Fig. 30-UnitWiring Diagram
Fig. 31-ControlCenter
Fig. 32-EACTerminals on Control Center
B. Combustion-Airand Vent Piping
GENERAL
Fig. 34-ThermidistatConnection
Fig. 33-355MAVVariable Speed Furnace Control
Page
Fig. 36-Combustion-Airand Vent Pipe Connections
Fig. 37-ShortVent 5 to 8 ft System
COMBUSTION-AIRAND VENT PIPE DIAMETER
Table 7-MaximumAllowable Pipe Length ft
COMBUSTION-AIRAND VENT PIPE ATTACHMENT
Table 7-MaximumAllowable Pipe Length ft Continued
Fig. 38-IntakeHousing Plug Fitting Drain
Table 7-MaximumAllowable Pipe Length ft Continued
Fig. 39-RoofTermination Preferred
Fig. 42-SidewallTermination of 12 in. or More
Fig. 43-SidewallTermination of Less than 12 in
EXTENDED EXPOSED SIDEWALL PIPES
TWO-PIPETERMINATION KIT
CONCENTRIC VENT/AIR TERMINATION KIT
PROCEDURE 10-CONDENSATEDRAIN A. General
Ambient
D. Multiventing and Vent Terminations
B. Application
C. Condensation Drain Protection
Fig. 47-SidewallTermination of 12 in. or Less
Fig. 48-SidewallTermination of More than 12 in
Fig. 49-Exampleof Field Drain Attachment
Fig. 50-CondensateTrap Heat Tape
SEQUENCE OF OPERATION
PROCEDURE 1-SELF-TESTMODE
PROCEDURE 2-HEATINGMODE
PROCEDURE 3-HEATING MODE-TWOSTAGE
PROCEDURE 4-EMERGENCYHEAT MODE
PROCEDURE 5-COOLINGMODE
PROCEDURE 6-HEATPUMP MODE
A. Single-SpeedApplications
B.Two-SpeedApplications
PROCEDURE 7-CONTINUOUSFAN MODE
PROCEDURE 8-COMPONENTTEST
B. Two-SpeedApplications
PROCEDURE 9-BYPASSHUMIDIFIER MODE
PROCEDURE 10-DEHUMIDIFICATIONMODE
Table 10-BlowerOff Delay Setup Switch SW Position
PROCEDURE 11-ZONEMODE
START-UPPROCEDURES PROCEDURE 1-GENERAL
PROCEDURE 2-SELECTSETUP SWITCH POSITIONS
Fig. 53-Exampleof Setup Switch in OFF Position
Fig. 54-InducerHousing Drain Tube
C. Setup Switches SW
1 OFF
Table 11-SetupSwitch Description
Table 12-BlowerOff Delay Setup Switch Position
PROCEDURE 3-PRIMECONDENSATE TRAP WITH WATER
PROCEDURE 4-PURGEGAS LINES
Fig. 55-FillingCondensate Trap
Sea Level
Sea Level
Sea Level
CANADA
Fig. 56-RedundantAutomatic Gas Valve
Fig. 57-BurnerOrifice
B. Set Temperature Rise
Fig. 58-BurnerFlame
Table 14-AltitudeDerate Multiplier for U.S.A
C. Set Thermostat Heat Anticipator
PROCEDURE 6-CHECKSAFETY CONTROLS
B. Check Pressure Switches
Table 15-GasRate Cu Ft/Hr
A. Check Primary Limit Control
PROCEDURE 7-CHECKLIST
Fig. 59-AmpDraw Check with Ammeter
Page
Book/Tab 1/6
Catalog No