CHECKLIST—INSTALLATION

Load Calculation

 

Condensate Drain

 

_______

 

 

_______

 

Unit Level or Pitched Forward

 

Heating Load (Btuh)

_______

 

Internal Tubing Connections Freeof Kinks and Traps

_______

 

Cooling Load (Btuh)

_______

 

External Drain Connection Leak tight and Sloped

_______

 

Furnace Model Selection

_______

 

Condensate Trap Primed before Start-Up

 

 

 

_______

 

Heat Tape Installed if Required

COMBUSTION AND VENT PIPING

CHECKLIST—START-UP

Terminal Location

 

 

 

 

 

_______

 

Roof or Sidewall

 

 

 

_______

 

Termination Kit — 2 Pipe or Concentric

 

 

 

______

 

Combustion-Air Pipe Length

 

 

 

______

 

Combustion-Air Elbow Quantity

______

 

Gas Input Rate(Set Within 2 percent of RatingPlate)

______

 

Vent Pipe Elbow Quantity

______

 

Temperature Rise Adjusted

______

 

Pipe Diameter Determined from

 

 

 

______

 

Sizing Table

 

 

 

______

 

Pipe Sloped to Furnace

 

 

 

Pipe Insulation

 

Thermostat Anticipator

______

 

Over Ceilings

______

 

Anticipator Setting Adjusted or

______

 

Low-Ambient Exposed Pipes

______

 

Cycle Rate (3 Cycles per Hr)Selected

Safety Controls Check Operaton

 

 

 

______

 

 

Primary Limit

 

______

 

 

Pressure Switch

 

—59—