Chapter 3 Installing the Content Delivery Engines

Tools and Parts Required

Depending on your application, you may have multiple streamers and vaults. A network switch is employed to link multiple servers together within a larger network.

Tools and Parts Required

You need the following tools to install the CDEs:

CDE100, CDE200, CDE300 or CDE400

Hard disk drives

Antistatic mat

Properly grounded ESD-preventive device

1/4-inch flat-blade screwdriver

3/16-inch flat-blade screwdriver

Number 2 Phillips screwdriver

Unpacking the Box

Each Cisco CDE is securely packaged in a shipping box. The cards and power supplies ship installed in the CDEs.

Caution Proper ESD protection is required whenever you handle Cisco equipment. Installation and maintenance personnel should be properly grounded through the use of grounding straps to eliminate the risk of ESD damage to the equipment. Modules are subject to ESD damage whenever they are removed from the chassis.

To unpack the shipping container, follow these steps:

Step 1 Inspect the packing containers.

If any damage or other signs of mishandling are evident, inform both the local freight carrier and Cisco before unpacking. Your freight carrier can provide you with the procedures necessary to file a claim for damages.

Step 2 Carefully open the box.

Step 3 Remove all packing material.

Step 4 Remove the chassis from the box.

Step 5 Carefully open the additional boxes, remove the packing material, and remove the drives and other contents.

Step 6 Open the accessory kits and boxes that contain the cables and so forth. Do not use a knife to open these boxes.

Tip Save these boxes should you need to return any components to Cisco.

Cisco Content Delivery Engine 100/200/300/400 Hardware Installation Guide

3-2

OL-13478-03

 

 

Page 42
Image 42
Cisco Systems 100/200/300/400 specifications Tools and Parts Required, Unpacking the Box