Cisco Systems Cisco IGX 8400 Series Installation and Configuration, 9.3 Feb. 27 2000 1427 PST

Models: IGX 8400 Series

1 52
Download 52 pages 51.44 Kb
Page 42
Image 42
9.3 Feb. 27 2000 14:27 PST

Attaching Peripherals

Step 6 After the workstation and IGX node interface have been set up, Cisco WAN Manager can be started. After Cisco WAN Manager has started and the communication sockets are active, the dsplan screen looks like this:

D2.cb1

LAN cisco IGX 8410

9.3 Feb. 27 2000 14:27 PST

Active IP Address:

192.187.207.21

IP Subnet Mask:

255.255.255.0

TCP Service

Port:

5130

Default Gateway IP Address:

192.187.207.1

Maximum LAN

Transmit Unit:

1500

Ethernet Address:

00.55.43.00.04.55

Control Socket - Ready

 

Base Socket

Descriptor - 1

 

Open Socket

Descriptor - 2

 

Last Command: dsplan

Next Command:

Note “Sockets” is the BSD UNIX name for connections between processes and typically applies to network communication.

Note Before switching on the Cisco WAN Manager workstation, refer to the Cisco WAN Manager Operations publication.

3-42Cisco IGX 8400 Series Installation and Configuration

Page 42
Image 42
Cisco Systems manual Cisco IGX 8400 Series Installation and Configuration, 9.3 Feb. 27 2000 1427 PST