Manuals
/
Cisco Systems
/
Computer Equipment
/
Switch
Cisco Systems
ME 2400 manual Preface Conventions, OL-7678-01
Models:
ME 2400
1
12
88
88
Download
88 pages
56.61 Kb
9
10
11
12
13
14
15
16
<
>
Troubleshooting
Specification
Install
Two Twisted-Pair Crossover Cable Schematic
Network Configurations
Connecting to the 10/100 Ports
Reporting Security Problems in Cisco Products
Setting up the Switch
errors
Table B-2 Console Port Signaling Using a DB-25 Adapter
Page 12
Image 12
Preface
Conventions
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
xii
OL-7678-01
Page 11
Page 13
Page 12
Image 12
Page 11
Page 13
Contents
November
Cisco Systems, Inc 170 West Tasman Drive San Jose, CA
800 553-NETS Fax 408
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
Turn the television or radio antenna until the interference stops
C O N T E N T S
Preface
Purpose
Conventions
Preparing for Installation
Verifying Package Contents
Installing the Switch
Troubleshooting
Grounding the Switch C-2
IP Settings
Crossover Cable and Adapter Pinouts B-5
Contents
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Preface
Audience
Purpose
Organization
Conventions
viii
Varoitus TÄRKEITÄ TURVALLISUUSOHJEITA
Aviso INSTRUÇÕES IMPORTANTES DE SEGURANÇA
Este símbolo de aviso significa perigo. Você se encontra em uma situação em que há risco de lesões corporais. Antes de trabalhar com qualquer equipamento, esteja ciente dos riscos que envolvem os circuitos elétricos e familiarize-se com as práticas padrão de prevenção de acidentes. Use o número da declaração fornecido ao final de cada aviso para localizar sua tradução nos avisos de segurança traduzidos que acompanham o dispositivo
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
Preface Conventions
OL-7678-01
Related Publications
xiii
Obtaining Documentation
Cisco.com
Product Documentation DVD
Documentation Feedback
Cisco Product Security Overview
Ordering Documentation
Reporting Security Problems in Cisco Products
Obtaining Technical Assistance
Cisco Technical Support & Documentation Website
Submitting a Service Request
Definitions of Service Request Severity
xvii
Obtaining Additional Publications and Information
xviii
Setting up the Switch
Features
Product Overview
C H A P T E R
Front Panel Description
DC power connector
Ground connector
Front Panel Descriptions
10/100 Ports
SFP Module Slots
SFP Modules
LEDs
SFP Module Patch Cable
System LED
CONSOLE
Rear Panel Description
Port LEDs
Power Connectors
Cisco ME AC Switch Power Supply
Cisco ME DC Switch Power Supply
Management Options
Network Configurations
Switch Installation
Preparing for Installation
Warnings
C H A P T E R
Warning Class 1 laser product. Statement
Warning No user-serviceable parts inside. Do not open. Statement
Installation Guidelines
Fiber-Optic SFP Module Port Cabling Specifications continued
Verifying Package Contents
Verifying Switch Operation
Installing the Switch
Powering Off the Switch
Rack-Mounting
Removing Screws from the Switch
Figure 2-1 Removing Screws from the Cisco ME Switch
Attaching Brackets to the Switch
Figure 2-2 Rack-Mounting Brackets
Attaching Brackets to 19-Inch Racks
2-10
240V
50-60
Attaching Brackets for 23-Inch Racks
2-11
Cisco ME
Attaching Brackets to 24-Inch Racks
2-12
Cisco
2-13
Attaching Brackets for ETSI Racks
2-14
Mounting the Switch in a Rack
2-15
Figure 2-15 Mounting the Cisco ME Switch in a Rack
Attaching the Brackets to the Switch for Wall-Mounting
Wall-Mounting
Attaching the Cable Guide
2-16
Mounting the Switch on a Wall
Statement
2-17
Installing and Removing SFP Modules
Installing SFP Modules into SFP Module Slots
Table- or Shelf- Mounting
2-18
2-19
Step 3 Align the SFP module in front of the slot opening
Removing SFP Modules from SFP Module Slots
2-20
Inserting and Removing the SFP Module Patch Cable
2-21
Connecting to the 10/100 Ports
2-22
Connecting to SFP Modules
Connecting to Fiber-Optic SFP Modules
2-23
Connecting to 1000BASE-T SFP Modules
2-24
Figure 2-26 Connecting to a 1000BASE-T SFP Module
Where to Go Next
2-25
2-26
Chapter 2 Switch Installation Where to Go Next
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Troubleshooting
Diagnosing Problems
Understanding POST Results
C H A P T E R
Symptom
Resolution
errors
Possible Cause
errdisable recovery cause
on the errdisable recovery
gbic-invalid global
the “Two Twisted-Pair
Symptom
Resolution
errdisable recovery cause
on the errdisable recovery
Technical Specifications
A P P E N D I X A
Appendix A Technical Specifications
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Connector and Cable Specifications
Connector Specifications
A P P E N D I X B
10/100 Ports
SFP Module Ports
Cable and Adapter Specifications
Two Twisted-Pair Cable Pinouts
Console Port
Four Twisted-Pair Cable Pinouts for 1000BASE-T Ports
Two Twisted-Pair Crossover Cable Schematic
Four Twisted-Pair Crossover Cable Schematics for 1000BASE-T Ports
Figure B-5
Crossover Cable and Adapter Pinouts
Identifying a Crossover Cable
Adapter Pinouts
Table B-2 Console Port Signaling Using a DB-25 Adapter
Connecting to DC Power
A P P E N D I X C
Preparing for Installation
Grounding the Switch
Preparing the Ground Wire
Page
Connecting the Grounding Wire to Earth Ground
Wiring the DC-Input Power Source
CONSOLE
Page
Figure C-11 Completed Wiring of Terminal Block Plug
Figure C-10 Torquing the Terminal-Block Captive Screws
CONSOLE
Figure C-12 Inserting the Terminal Block in the Block Header
C-10
Appendix C Connecting to DC Power Wiring the DC-Input Power Source
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Configuring the Switch with the CLI-Based Setup Program
Accessing the CLI Through the Console Port
A P P E N D I X D
Taking Out What You Need
Figure D-1 The Cisco ME Switch, Adapter Cable, and AC Power Cord
Figure D-2 The Cisco ME Switch, Adapter Cable, and DC Power Cord
Appendix D Configuring the Switch with the CLI-Based Setup Program
Connecting to the Console Port
Starting the Terminal-Emulation Software
Connecting to a Power Source
Entering the Initial Configuration Information
IP Settings
Completing the Setup Program
Page
Appendix D Configuring the Switch with the CLI-Based Setup Program
Entering the Initial Configuration Information
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
OL-7678-01
Numerics
I N D E
IN-1
IN-2
DC power
connecting to 2-7, D-5
exposed wire warning
IN-3
IN-4
IN-5
IN-6
Cisco ME 2400 Ethernet Access Switch Hardware Installation Guide
Index
OL-7678-01