Emerson Process Management GmbH & Co. OHG 8-41
X-STREAM XE
Instruction Manual
HASXEE-IM-HS
06/2010
8Troubleshooting
8.4 Troubleshooting on Components
Step 5:
To adjust the physical span:
Apply span gas to the analyzer.
Do not disconnect the DVM:
P4.5 Raw signal (+)
P4.15 Bridge voltage (-); GND
CAUTION!
Do not short-circuit pins!
Adjust the voltage to 10V
utilizing R119.
If 10V is not within the adjustable
range, it is necessary to change the
signal amplication with solder bridge
LB3:
Step 6:
Now once more check the zero point:
Apply zero gas to the analyzer.
Do not disconnect the DVM:
The voltage should be 0 V ± 500 mV.
If it does not, repeat from step 3!
P4.15
P4.5 Raw
For an amplication
factor of close
20 1-5
150 3-5
300 4-5
500 2-3-4-5
LB3
R119
P4