Instruction Manual
IB-106-300NH Rev. 4.2
July 2002
Rosemount Analytical Inc. A Division of Emerson Process Management P-7
World Class 3000
QUICK START GUIDE FOR IFT 3000 SYSTEMS
Before using the Quick Start Guide, please read “WHAT YOU NEED TO KNOW BEFORE
INSTALLING AND WIRING A ROSEMOUNT IFT 3000 INTELLIGE NT FIELD TRANSMIT-
TER WITH WORLD CLASS 3000 PROBE” on the preceding page.
1. Ins tall the probe in an appropriate location on the stack or duct. Refer to Section 2, p ara-
graph 2-1a for information on selecting a locatio n for the probe.
2. Conn ect calibration gas and reference air to the probe.
3. Verif y the jumper selection on the IFT 3000 power supply board, microprocessor board, and
interconnect board, as shown in Figure 2.
4. Ins tall the IFT 3000 in the desired location. Refer to Section 2, paragraph 2-2a f or informa-
tion on selecting a location for the IFT 3000.
5. W ire the probe to the IFT as shown in Figure 2.
6. Conn ect line voltage to the IFT as shown in Figure 2.
7. App ly power to the IFT 3000. Allow sufficient time for the probe to reach normal oper ating
temperature. The time required will vary based on pr ocess temperature and other variables.
8. Perf orm a manual (semiautomatic) calibration. Press the CAL key on the GUI. Select the
PERFORM CALIBRATION sub-menu. “Press ENTER to star t Manual Calibration” will
appear on the LCD display. Press ENTER to start the c alibration process. Follow the in-
structions on the LCD display. Refer to Section 4, Calibration, for more information on per-
forming a calibration.