
Contents
| 3.1.1 | Temperature measurement point | |||||||
| 3.1.2 | Temperature requirements and measuring method | |||||||
| 3.1.3 | Air flow |
|
|
|
|
| ||
| 3.1.4 | Temperature rise under several conditions | |||||||
| 3.1.5 | Air purity |
|
|
|
| |||
| 3.2 |
| Mounting Requirements |
|
| ||||
| 3.2.1 | External dimensions |
|
| |||||
| 3.2.2 | Installation direction |
|
| |||||
| 3.2.3 | Centers of gravity |
|
| |||||
| 3.2.4 | Notes on mounting |
|
| |||||
| 3.3 |
| Power Supply Requirements |
| |||||
| 3.4 |
| Cable Connections |
|
| ||||
| 3.4.1 | Drive connectors |
|
| |||||
| 3.4.2 | Cable connector specifications | |||||||
| 3.4.3 | Drive connection |
|
| |||||
| 3.5 |
| Jumper Settings |
|
|
| |||
| 3.5.1 | Jumper settings at factory shipping | |||||||
| 3.5.2 | Mode setting |
|
|
| ||||
| 3.6 |
| Notes on Drive Handling |
|
| ||||
| 3.7 | Mounting |
|
|
|
| |||
| 3.7.1 | Checks before mounting the drive | |||||||
| 3.7.2 | Mounting procedure |
|
| |||||
| 3.8 |
| Cable Connections |
|
| ||||
| 3.9 |
| Operation Confirmation and Preparation for Use after Installation | ||||||
| 3.9.1 | Confirming initial operations | |||||||
| 3.9.2 | Connection check |
|
| |||||
| 3.10 |
| Dismounting Drive |
|
| ||||
CHAPTER 4 | Host Interface | ............................................................................. |
|
|
| ||||
| 4.1 |
| Pin Assignment |
|
|
| |||
| 4.2 |
| Signal Description |
|
|
x |