Installation Requirements
1)Make sure that the system power is off.
2)Do not connect or disconnect any cable when the power is on.
1)Connect the DC ground cable (only if required to decrease ground noise).
2)Connect the power cables.
3)Connect the AT interface cable.
4)After each cable connector is connected, secure the cable so that the cable does not touch the drive or the parts on the PCA or obstruct the flow of cooling air in the system cabinet.
3.9Operation Confirmation and Preparation for Use after Installation
3.9.1 Confirming initial operations
This section provides the operation check procedures after the power is turned on.
(1) Initial operation when the power is turned on
∀
∀
∀
When the power is turned on, the drive starts initial
If an error is detected during initial
In case of not inserted the cartridge, when the power is turned on, the eject motor automatically turns once.
(2) Checks if errors occur at initial
∀
∀
∀
∀
Make sure that the cables are connected correctly.
Make sure that the supply voltage is correct. (Measure the voltage at the power supply connector of the optical drive.)
Make sure that the settings of all terminals are correct.
If the LED on the front panel blinks continuously, an error was detected during initial