Initial Setup 2-1
April 2004

Chapter 2

Initial Setup

Before making measurements, you must prepare the TransPort
for operation. This includes the following procedures:
Making Electrical Connections
Charging and/or Replacing Batteries
Powering On and Off
Using the Screen and Keypad
Obtaining On-Line Help
Figure 2-1 below shows the PT878GC in its specially designed
case. The interior is molded for optimal protection of the meter
and its accessories.
Figure 2-1: The PT878GC and Accessories