Menu Maps A-3
April 2004

Figure A-3: The Program Menu:Transducer, Lining, Fluid and Path Options

Menu
Program
Wetted Clamp-on
(Preprogrammed
Units) Special
Frequency
Time Delay
(Wetted) (Clamp-on)
Wedge Angle
Wedge
Temperature
Wedge
Sound Speed
Transducer Pipe
(See Figure A- 4)
Lining
None Tar Epoxy Glass
(Pyrex) Asbestos
Cement
Material
Sound
Speed
Mortar Rubber Teflon Other
Thickness
Fluid
Fluid
Steam
Natural
Gas
Air
Sound Speed
Other
(See Figur e A-5)
Path
(Wetted) (Clamp-on)
Path Length
Axial Length
Traverses
Spacing
Wedge
Temperature
(Clamp-on)