Advanced Operations

Should individual program sequences be repeated?

The elements of a measuring sequence, such as zero and sample measurements and the timer(s) (reaction times, waiting times, etc.) are individually defined.

6.1.2.2 Enter a new element of a measuring sequence

Important Note: Each component of the measurement process must be entered in the order in which it will be completed.

1.Highlight the Measurement Process line in the data overview and press Edit.

2.Press Edit again and then New.

Content and definition of the keys

[Z] key / Zeroing

1.Press the [Z] key to program a zero measurement. Confirm with OK.

2.Press New and then Zeroing... and use the alphanumeric keypad to enter the wavelength at which the zero measurement is to be completed. Press OK and confirm the input by pressing OK again.

3.If zero measurements are to be carried out at a number of wavelengths, repeat the above two steps for each wavelength.

Note: The entered measurement sequence is displayed.

73

Page 73
Image 73
Hach DR 2800 user manual Enter a new element of a measuring sequence, Content and definition of the keys Key / Zeroing