1. Top Vent - Horizontal Termination - (continued)
|
| Top Vent - Horizontal Termination | ||
|
| Venting with 2 elbows | ||
|
|
|
|
|
V Minimum |
| H1 + H2 Maximum |
| Note: Use SLP Series |
90 Elbow |
|
| components only. | |
1 ft. (305 mm) |
| 3 ft. (914 mm) |
|
|
|
|
|
|
|
|
|
| ||
2 ft. (610 mm) |
| 5 ft. (1.52 m) |
|
|
|
|
|
|
|
2.5 ft. (762 mm) |
| 6 ft. (1.85 m) |
|
|
|
|
|
|
|
3 ft. (914 mm) |
| 7 ft. (2.13 m) |
|
|
|
|
|
|
|
3.5 ft. (1066 mm) |
| 10 ft. (3.05 m) |
|
|
|
|
|
|
|
4 ft. (1.2 m) |
| 15 ft. (4.6 m) |
|
|
|
|
|
|
|
H + H1 | Max. = 15 ft. (4.6 m) |
|
| |
V + H + H1 Max. = 40 ft. (12.2 m) |
|
|
H2 | H1 |
|
INSTALLED
HORIZONTALLY
V1
Figure 7.4
26 | Heat & Glo • |