F. Install Metal Roof Flashing

See minimum vent heights for various pitched roofs (Figure 10.11) to determine the length of pipe to extend through the roof.

Slide the roof flashing over the pipe sections extending through the roof as shown in Figure 10.12.

HORIZONTAL

OVERHANG

20 in.

(510 mm) MIN.

24 in.

 

VERTICAL

(610 mm) MIN.

 

 

 

WALL

LOWEST

DISCHARGE

OPENING

TERMINATION

CAP

12 in. X

(305 mm)

ROOF PITCH

IS X/ 12 in. (305 mm)

H (MIN.) - MINIMUM HEIGHT FROM ROOF

TO LOWEST DISCHARGE OPENING

Angle

H (Min.) mm

0°-26.6°

............................................................500*

26.6°-30.3°

............................................................500*

30.3°-33.7°

............................................................500*

33.7°-36.9°

............................................................610*

36.9°-39.8°

............................................................760

39.8°-42.5°

............................................................990

42.5°-45.0°

.........................................................1220.

45.0°-49.4°

.........................................................1520.

49.4°-53.1°

.........................................................1830.

53.1°-56.3°

.........................................................2130.

56.3°-59.0°

.........................................................2290.

59.0°-60.3°

.........................................................2440.

*910 mm minimum in snow regions

Figure 10.11 Minimum Height From Roof To Lowest Discharge Opening

NOTICE: Failure to properly caulk the roof flashing and pipe seams could cause water entry.

Caulk the gap between the roof flashing and the outside diameter of the pipe.

Caulk the perimeter of the flashing where it contacts the roof surface. See Figure 10.12.

Caulk the overlap seam of any exposed pipe sections that are located above the roof line.

CAULK

Figure 10.12

G. Assemble and Install Storm Collar

CAUTION! Risk of Cuts, Abrasions or Flying Debris. Wear protective gloves and safety glasses during instal-

lation. Sheet metal edges are sharp.

Connect both halves of the storm collar with two screws (see Figure 10.13).

Wrap the storm collar around the exposed pipe section closest to the roof and align brackets. Insert a bolt (provided) through the brackets and tighten the nut to complete the storm collar assembly. Make sure the collar is tight against the pipe section.

Slide the assembled storm collar down the pipe section until it rests on the roof flashing (see Figure 10.14).

Caulk around the top of the storm collar (see Figure 10.15).

Figure 10.13 Assembling the Storm Collar

Figure 10.14 Assembling the Storm Collar Around the Pipe

Heat & Glo • XLR-N-AU, XLR-PB-AU2198-906 Rev. M • 5/12

39

Page 39
Image 39
Heat & Glo LifeStyle XLR-N-AU, XLR-PB-AU manual Install Metal Roof Flashing, Assemble and Install Storm Collar