C 4.74

Operating instructions

Maintenance during the first period of operation

The following checks and services are due during the first period of operation:

Maintenance after the first 50 hours

Maintenance after the first 150 hours

Maintenance after the first 500 hours

Maintenance after the first 50 hours

Check the engine for leaks

-Raise the dump body (loading platform*) and secure it against accidental lowering.

-Check the engine and implements for leaks.

Carry out the other services in accordance with the mainte- nance schedule. You can find the description of the serv- ices using the indications in the maintenance schedule or in the alphabetical index.

* Option

149 443

161

Page 162
Image 162
Holder 4.74 manual Maintenance during the first period of operation, Maintenance after the first 50 hours