C 4.74

Operating instructions

Operating the implements

Attaching implements

The various implements are attached to the front or rear power lift*.

There are 2 different fastening categories: Category I Pin diameter 22 mm Category II Pin diameter 28 mm

The vehicle can be adjusted to both categories by adjusting the pintle hook bars and providing the pintle hooks with or without reducer sleeves.

DANGER

Only use the following specified devices for attaching your implement.

Secure the implement against shifting or roll- ing.

* Option

149 443

81

Page 82
Image 82
Holder 4.74 manual Attaching implements