Installing the SAN Switch 2/8

2.Repeat steps 1a through 1d to attach right front bracket (Item 8) to the right side of the switch, see Figure 6.

2

5

1

4

3

6

7

8

SHR-2501A

1Left front bracket

2 Left rear bracket

3 6-32 x 5/16” pan head Phillips screws 4 Right rear bracket

510-32 x 38” pan head Phillips screws

6 Retainer nuts

7 6-32 x 5/16” pan head Phillips screws 8 Right front bracket

Figure 6: Attaching the Fixed Rack Mount Kit rails to the switch

3.Position the switch in the rack as shown in Figure 6, providing temporary support under the switch (use clamps if necessary).

4.To secure the front brackets to the rack’s front rails, attach the right front bracket (Item 8) to the right front rack rail using two 10-32 x 3/8 inch screws (Item 5) and two retainer nuts (Item 6).

5.Repeat step 4 to attach the left front brackets (Item 1) to the left front rack rail.

6.Tighten all screws and torque to 25-inch pounds.

34

hp StorageWorks SAN Switch 2/8 Installation Guide

Page 34
Image 34
HP AA-RSB6B-TE manual Attaching the Fixed Rack Mount Kit rails to the switch