Installing the SAN Switch 2/8

2. Connect the Serial cable to the SAN Switch 2/8 Serial port, see Figure 15.

SHR-2497B

Figure 15: Connecting the Serial cable

3.Connect the other end of the Serial cable to an RS-232 Serial port on the workstation. If no RS-232 Serial port is available on the workstation, the adapter on the end of the Serial cable can be removed to use the RJ-45 connector to create a Serial connection.

4.Verify that the switch power is on and POST is completed. See the “Power On Self-Test section, on page page 46 in this chapter.

5.Power on the workstation and establish a connection to the switch using a terminal emulator application (such as Hyperterminal).

Note: Step 6 shows instructions specific to HyperTerminal. If using a different application, consult the specific application’s documentation.

6.Using Hyperterminal configure the port settings as follows:

Bits per second: 9600

Databits: 8

Parity: None

Stop bits: 1

Flow control: None

48

hp StorageWorks SAN Switch 2/8 Installation Guide

Page 48
Image 48
HP AA-RSB6B-TE manual Connecting the Serial cable