Table 24. Removal steps of LCD unit (continued)

 

Step

Screw cap

Screw (quantity)

Color

Torque

 

 

 

 

 

 

 

 

 

 

 

M2.5 × 6.5 mm, flat-head, nylon-coated (2)

Black

0.392 Nm

 

2

 

 

 

 

 

 

 

 

(4.0 kgfcm)

 

 

 

 

 

 

 

When installing:

Make sure that you route the cables firmly and tape up in the proper positions as shown in this figure.

When you route the cables, make sure that they are not subjected to any tension. Tension could cause the cables to be damaged by the cable guides, or a wire to be broken.

Chapter 8. Removing and replacing a FRU 101

Page 107
Image 107
IBM T410SI, T400S manual Step Screw cap Screw quantity Color Torque, When installing