Lincoln 1100 Series service manual IGNITION CONTROL 1.Shut off power at main breaker

Models: 1100 Series

1 92
Download 92 pages 44.78 Kb
Page 54
Image 54
IGNITION CONTROL

IGNITION CONTROL

1.Shut off power at main breaker.

2.Shut of the gas supply in the main line to the oven.

3.Remove conveyor.

4.Remove the front control compartment cover.

Note: After S/N 2011383 a removable drip tray is located above the ignition control.

5.Disconnect the wires from the ignition control and mark their location for reinstallation.

6.Remove the 4 mounting screws and remove the control.

7.Reassemble in reverse order.

8.Turn on electrical power and gas supply, then check the system for proper operation.

26

27

YELLOW

YELLOW

33

VALVE

VALVE

GND

25 V

25V

GND

BURNER GROUND

L2

NEUTRAL

HSI

120V

HSI

120V

L 1 HOT

11

34

35

32

IGNITION CONTROL

TRANSFORMER, STEP DOWN 24 VAC

1.Shut off power at the main breaker.

2.Remove conveyor.

3.Remove front control compartment cover.

4.Remove wires from transformer and mark for reassembly.

5.Remove 2 mounting screws and replace transformer.

6.Reassemble in reverse order.

BURNER VENTURI

See “Hot Surface Igniter”

HOT SURFACE IGNITER

1.Shut off the electrical power at main breaker.

2.Shut off the gas supply in the main line to the oven.

3.Remove conveyor.

4.Remove rear control compartment cover.

5.Remove Conveyor Motor.

6.Remove electrical plug from the burner cap.

7.Loosen the pipe union in the gas line.

8.Remove 3 screws holding burner cap to burner tube.

9. Pull out on burner cap removing cap and burner venturi.

10.The hot surface igniter is held in place on the burner venturi by a screw, loosen screw and remove igniter.

11.Replace in reverse order.

 

NOTE: Care must be used when handling the hot surface igniter as they are quite fragile and may be

 

easily broken if dropped or bumped.

54

Impinger II - 1100 Series Service Manual - International

Page 54
Image 54
Lincoln 1100 Series service manual IGNITION CONTROL 1.Shut off power at main breaker