ORIFICE, MAIN BURNER

1.Shut off power at main breaker.

2.Shut off gas at main line to the oven.

3.Remove conveyor.

4.Remove control compartment covers.

5.Loosen 4 nuts holding manifold to burner cap.

6.Loosen pipe union. Remove valve and manifold.

7.Remove main orifice

8.Reassemble in reverse order.

ORIFICE, BYPASS

1.Loosen flare nut and remove bypass orifice.

2.Reassemble in reverse order.

THERMOSTAT, HIGH LIMIT, OVEN CAVITY

1.Shut off power at main breaker.

2.Remove conveyor.

3.Remove control compartment covers.

4.Remove screws from bracket.

5.Remove the mounting nut from the threaded shaft.

6.Remove the capillary tube bulb from the wireholder in the oven heating chamber.

NOTE: Access to the capillary tube bulb is through the front door, after removing the conveyor and fingers.

7. Insert the new capillary tube bulb through the tube into the oven cavity and into the wire form holder NOTE: The wire form must hold the bulb firmly. If it does not, compress the wire form slightly to increase the pressure.

8.Reassemble in reverse order.

9.Push the reset button. Test system for proper operation.

THERMOSTAT, HIGH LIMIT

1.Shut off power at main breaker.

2.Remove conveyor.

3.Remove control compartment covers.

4.Remove 2 screws from holding bracket located in upper rear of the control compartment.

5.Remove the 2 leads and remove thermostat. NOTE: Push reset button

6.Insure that aluminum probe and teflon washer are in place (if applicable), then reassemble in reverse order.

7.Insure that thermostat is in firm contact with the aluminum probe (if applicable).

Impinger II - 1100 Series Service Manual - International

55

Page 55
Image 55
Lincoln 1100 Series Orifice, Main Burner, Shut off power at main breaker, Shut off gas at main line to the oven