Chapter 4: Subsystem Connection and Operation

Figure 4 - 2: Sample Topology: Connection and Host LUN Mapping

4.3 Power On

Once all the components have been installed in the EMD subsystem, the iSCSI ports have been connected to the network, power on the network devices, the subsystem, and then power on the servers/iSCSI initiators.

4-5

Page 51
Image 51
Meridian Data 16i manual Power On, Sample Topology Connection and Host LUN Mapping