Installation Instructions |
| |
MVME197LE Module Installation | 2 | |
Now that the MVME197LE module is ready for installation, proceed as | ||
| ||
follows: |
|
a.Turn all equipment power OFF and disconnect the power cable from the power source.
Caution
!
WARNING
Inserting or removing modules while power is applied could result in damage to module components.
DANGEROUS VOLTAGES, CAPABLE OF CAUSING DEATH, ARE PRESENT IN THIS EQUIPMENT. USE EXTREME CAUTION WHEN HANDLING, TESTING, AND ADJUSTING.
b.Remove the chassis cover as instructed in the equipment user’s manual.
c.Remove the filler panel(s) from the appropriate card slot(s) at the front and rear of the chassis (if the chassis has a rear card cage). The MVME197LE module requires power from both P1 and P2. It may be installed in any
d.Carefully slide the MVME197LE module into the card slot. Be sure the module is seated properly into the P1 and P2 connectors on the backplane. Do not damage or bend connector pins. Fasten the module in the chassis with screws provided, making good contact with the transverse mounting rails to minimize RFI emissions.
e.Remove the IACK and BG jumpers from the header on the chassis backplane for the card slot in which the MVME197LE is installed.
f.Connect the P2 Adapter Board and specified cable(s) to the MVME197LE at P2 on the backplane at the MVME197LE slot, to mate with (optional) terminals or other peripherals at the
MVME197LE/D2 |