Preinstallation requirements

Standard 1.04

The following diagram shows how to: 1) align the tabs, 2) engage the cover, and 3) tighten the thumbscrews.

Top and

bottom tabs

on cover

Top and

bottom slots

in chassis

1

2

3

G101762

What’s next?

If you want to install the chassis feet on the bottom of the server, continue with “Installing the chassis feet” on page 45. Otherwise, continue with the hardware installation. For more information, see “Installation checklist” on page 34.

44

CallPilot

Page 44
Image 44
Nortel Networks 703t manual Top