Unpacking and Inspection

CTI-CRYOGENICS

HELIX TECHNOLOGY CORPORATION

UNLOCK SWIVEL CASTERS

Figure 2-1: Using the Shipping Carton Ramp

Compressor Inspection

Inspect the Compressor for visible signs of damage as indicated in the following paragraphs.

Compressor

Inspect the exterior of the Compressor for visible signs of damage, evidence of an oil leak, and check the Helium Pressure Gauge for proper helium pressure. Report any damage to the shipping company at once.

Helium Static Pressure Verification

Refer to Section 4 - Operation for more information on the static helium charge pressure of the 9600 Compressor.

Shipping Carton Contents

The shipping carton should contain the following items:

Compressor

Two barbed fittings for flexible water lines

Installation, Operation, and Maintenance manual

Compressor remote start connector and strain relief

2-2

P/N 8040540

Page 23
Image 23
Olicom 9600 manual Compressor Inspection, Helium Static Pressure Verification, Shipping Carton Contents