Olicom 9600 manual Unpacking and Inspection, Introduction, Shipping Carton Inspection

Models: 9600

1 59
Download 59 pages 31.15 Kb
Page 22
Image 22

9600 Compressor Installation, Operation, and Maintenance

CTI-CRYOGENICS

HELIX TECHNOLOGY CORPORATION

Section 2 - Unpacking and Inspection

Introduction

The 9600 Compressor is shipped in a shipping carton incorporating a ramp system which makes removing the Compressor from the carton safe and easy.

Shipping Carton Inspection

Inspect the exterior of the shipping carton for visible signs of damage before opening the shipping carton. Report any damage to the shipping company at once.

Removal from Shipping Carton

1.Cut the two straps on the exterior of the shipping pallet.

2.Lift the cardboard carton straight up and remove it from the pallet.

3.Cut the tape which holds the ramp in the vertical position.

4.Swing the ramp down until the end touches the floor as shown in Figure 2-1.

5.Remove any excess shipping material from around the Compressor.

WARNING

Be certain to maintain control over the movement of the Compressor as it rolls down the ramp. Injury to personnel may result if the Compressor is allowed to roll freely down the ramp.

CAUTION

Be certain to maintain control over the movement of the Compressor as it rolls down the ramp. Damage to the Compressor may

result if the Compressor is allowed to roll freely down the ramp.

6.Unlock the swivel casters as shown in Figure 2-1.

7.Carefully roll the Compressor down the ramp and onto the floor as shown in Figure 2-1.

P/N 8040540

2-1

Page 22
Image 22
Olicom 9600 manual Unpacking and Inspection, Introduction, Shipping Carton Inspection, Removal from Shipping Carton