Sterling SSPET 5 operating instructions SSPET5 2.4. Compressed-air supply, Assembly instructions

Models: SSPET 5

1 50
Download 50 pages 3.15 Kb
Page 21
Image 21
SSPET5

SSPET5

2.4. Compressed-air supply

For operating the cleaning unit, a compressed-air supply is necessary.

L

F

Depressurize compressed-air supply lines which must be opened.

Compressed air must be dewatered, dustfree and oilfree.

Install a maintenance unit if required.

Adjust pressure to a max. value of 6 bar (87.02 PSI) (system overpressure).

Check compressed-air piping for correct installation and assembly.

Check fittings, length and quality of the hose connections for agreement with re- quirements.

The operating pressure is 5-6 bar (72.52-87.02 PSI) (system overpressure). Check the compressed-air supplied by the plant’s supply network.

Adjust compressed-air pressure to 5-6 bar (72.52-87.02 PSI) (system overpressure).

Connect the unit to the plant’s supply network by means of a hose.

SM4-630

Assembly instructions 20

Page 21
Image 21
Sterling SSPET 5 SSPET5 2.4. Compressed-air supply, For operating the cleaning unit, a compressed-air supply is necessary