Sterling SSPET 5 operating instructions Putting into operation, SSPET5

Models: SSPET 5

1 50
Download 50 pages 3.15 Kb
Page 27
Image 27
4. Putting into operation

SSPET5

4. Putting into operation

»

F

This chapter is intended for operating personnel.

Prerequisite for this chapter is general knowledge of the opera- tion of conveying systems.

Also prerequisite for this chapter is that the functional descrip- tion has been read and understood.

Ensure in each case that the operating personnel are suffi- ciently informed.

Make sure the plastic stopper has been removed from the material inlet nozzle.

Make sure the adhesive tape has been removed from the exit flap.

SM4-630

Putting into operation 26

Page 27
Image 27
Sterling SSPET 5 operating instructions Putting into operation, SSPET5