SSPET5
4.3. Setting the controller SSE
F
&
The filling capacity of the hopper loader may not exceed the material inlet.
The setting is independent of the conveying line and the ma- terial to be conveyed.
It is only possible to set the conveying time / line clear time when the unit is not conveying any material.
Setting the conveying time
Press the “arrow key”.
&
The conveying time which was last selected appears in the display.
The turbine is running but no material is being conveyed:
Reduce the conveying time.
The conveying capacity is too low:
Increase the conveying time.