Preface

The Netra 1290 Server Installation Guide provides detailed procedures that describe the installation, power-on, and configuration of the Netra™ 1290 server into a rack. This document is written for technicians, system administrators, authorized service providers (ASPs), and users who have experience installing and configuring computer hardware.

How This Document Is Organized

Chapter 1 describes how to unpack your server and install it into a cabinet or rack.

Chapter 2 describes how to cable, power on, and perform setup tasks with your server.

Appendix Aprovides connector locations, signals, and pinouts.

Using UNIX Commands

This document might not contain information about basic UNIX® commands and procedures such as shutting down the system, booting the system, and configuring devices. Refer to the following for this information:

Software documentation that you received with your system

Solaris™ Operating System documentation, which is at: http://docs.sun.com

ix

Page 9
Image 9
Sun Microsystems 1290 manual How This Document Is Organized, Using Unix Commands