Maintenance

3.Cushion the instrument on all sides by tightly packing dunnage or urethane foam between the carton and the instrument. Allow 3 inches on all sides for cushioning.

4.Seal the carton with shipping tape or industrial stapler.

6- 28

1705A Spectrum Monitor

Page 153
Image 153
Tektronix instruction manual 1705A Spectrum Monitor