Incoming Inspection
1-20 CSA8000B & TDS8000B User Manual

Perform the Compensation

This procedure uses internal routines to verify that the instrument compensates
properly.
Equipment required For sampling modules:
H50 terminations on all electrical module channels (Tektronix
part number 015-1022-xx).
HDust covers on all optical module channels.
The sampling modules ship from Tektronix with the proper termina-
tions and dust covers installed.
Prerequisites First, all sampling modules to be compensated must be installed as
outlined in their user manuals.
Second, power on the instrument and allow a 20 minute warm-up
before doing this procedure.
1. Run the compensation routines:
a. From the application menu bar, select Utilities, and then select Com-
pensation.
In the Compensation dialog box, the main instrument (mainframe) and
sampling modules are listed. The temperature change from the last
compensation is also listed. See Figure 1--6.
Click to select compensate
Click to start compensation
Choose all as targets
Figure 1- 6: Compensation dialog box