Teledyne 4060 manual The stability of the electrometer circuit can be tested as follows

Models: 4060

1 79
Download 79 pages 47.82 Kb
Page 74
Image 74
The stability of the electrometer circuit can be tested as follows:

Maintenance

Series 4060

 

 

 

 

 

 

The circuit consists of an electrometer amplifier and an operational amplifier. It is a very high-gain, current-to-voltage converter circuit, having an input impedance measuring in the billions of ohms. It is static sensitive and highly susceptible to contamination, and special handling precautions must be taken.

Because of its high impedance, the input circuitry to the electrometer has had careful design consideration. The resistors (R2 and R3) in the input gain circuit (see schematic) are installed on Teflon-insulated standoffs, instead of directly to the printed circuit, to eliminate the possibility of leakage currents.

To eliminate any possibility of contamination of the insulating materials employed, the completed PC board is ultrasonically cleaned in laboratory grade alcohol. Under no circumstances should the parts described be handled with bare fingers. A freshly-scrubbed finger, stroked along one of the glass resistors, would deposit enough skin oil to completely upset the range division of the attenuator circuit.

Resistor R3 is a 1000 MΩ resistor used in the feedback circuit of the amplifier. R2 has a resistance of 10,000 MΩ and is used in series with the zero potentiometer slider. This circuit is used to nullify any offset signal introduced by the signal electrode. Trimmer P1 is used to nullify the offset signal generated by the electrometer amplifier.

The output of the circuit is standardized against gases with known hydrocarbon concentrations by zero and span calibration, so that the meter and/or recorder indicate the hydrocarbon concentration of the gas being used.

The positive and negative operating voltage required by the electrometer amplifier is furnished by a switching power supply circuit, mounting at the back panel of the Analyzer

The stability of the electrometer circuit can be tested as follows:

1.Disconnect the collector cable.

2.Place the analyzer in the auto range.

3.Adjust zero offset value so that the recorder reads at some point upscale, and record a 24 hour chart.

74

Teledyne Analytical Instruments

Page 74
Image 74
Teledyne 4060 manual The stability of the electrometer circuit can be tested as follows