Toshiba RAV-SP1104AT8Z-E Air Purging, Refrigerant Pipe Length, Airtight test, Air Purge, EN-18

Models: RAV-SP1404AT8Z-E RAV-SP1104AT8Z-E RAV-SP1404AT8ZG-E RAV-SP1404AT8-E RAV-SP1604AT8-TR RAV-SP1104AT8Z-TR RAV-SP1604AT8-E RAV-SP1404AT8-TR RAV-SP1604AT8Z-E RAV-SP1104AT8ZG-E RAV-SP1404AT8Z-TR RAV-SP1404AT8ZG-TR RAV-SP1104AT8-TR RAV-SP1104AT8ZG-TR

1 143
Download 143 pages 52.35 Kb
Page 110
Image 110
￿Refrigerant Pipe Length

Super Digital Inverter

￿Refrigerant Pipe Length

Single

Allowable pipe length (m)

 

Height difference (Indoor-outdoor H) (m)

 

 

 

 

Total length L

 

Indoor unit: Upper

Outdoor unit: Lower

 

 

 

 

75

 

30

30

 

 

 

 

 

 

 

Pipe diameter (mm)

 

Number of bent portions

 

 

 

Gas side

 

Liquid side

10 or less

 

 

 

Ø15.9

 

Ø9.5

 

 

 

 

 

Simultaneous twin, triple

 

 

 

 

Allowable pipe length (m)

 

Height difference (m)

 

 

Total length

Distributed

Distributed

Indoor-outdoor H

 

 

 

pipes

pipes

 

 

 

 

 

 

1 +

2

 

 

 

 

System

Model

2

3 –

2

 

 

Indoor-indoor

1 +

3

Indoor unit:

Outdoor unit:

 

 

3

4 –

2

( h)

 

 

1 +

4

Upper

Upper

 

 

4

4 –

3

 

 

 

Maximum

 

 

 

 

 

Maximum

Maximum

 

 

 

 

 

 

 

 

 

 

 

TWIN

SP110

 

 

50

 

15

 

 

10

30

30

0.5

SP140, SP160

 

 

50

 

15

 

 

10

30

30

0.5

 

 

 

 

 

 

TRIPLE

SP160 only

 

 

50

 

15

 

 

10

30

30

0.5

 

 

 

 

 

 

Pipe diameter (mm)

 

 

 

Super Digital Inverter

6 AIR PURGING

￿Airtight test

Before starting an airtight test, further tighten the spindle valves on the gas side and liquid side.

Pressurize the pipe with nitrogen gas charged from the service port to the design pressure (4.15 MPa) to conduct the airtight test.

After the airtight test is completed, evacuate the nitrogen gas.

￿Air Purge

With respect to the preservation of the terrestrial

environment, adopt “Vacuum pump” to purge air (Evacuate air in the connecting pipes) when installing the unit.

Do not discharge the refrigerant gas to the atmosphere to preserve the terrestrial environment.

Use a vacuum pump to discharge the air (nitrogen, etc.)

that remains in the set. If air remains, the capacity may decrease.

For the vacuum pump, be sure to use one with a backflow preventer so that the oil in the pump does not backflow into the pipe of the air conditioner when the pump stops.

(If oil in the vacuum pump is put in an air conditioner

including R410A, it may cause trouble with the refrigeration cycle.)

Vacuum pump

As shown in the figure, connect the charge hose after the

manifold valve is closed completely.

Attach the connecting port of the charge hose with a projection to push the valve core (setting pin) to the charge port of the set.

Open Handle Low fully.

Turn ON the vacuum pump. (*1)

Loosen the flare nut of the packed valve (Gas side) a little to check that the air passes through. (*2)

Retighten the flare nut.

Execute vacuuming until the compound pressure gauge

indicates –101 kPa (–76 cmHg). (*1)

110 –

System

 

Model

Main pipe

Branching pipe

 

Number of bent

 

portions

 

 

 

 

 

 

 

 

 

 

 

 

Gas side

Liquid side

Gas side

 

Liquid side

 

 

 

 

 

 

 

 

 

 

 

TWIN

 

SP110

Ø15.9

Ø9.5

Ø12.7

 

Ø6.4

 

10 or less

 

 

 

 

 

 

 

 

 

 

 

SP140, SP160

Ø15.9

Ø9.5

Ø15.9

 

Ø9.5

 

10 or less

 

 

 

 

 

 

 

 

 

 

TRIPLE

 

SP160 only

Ø15.9

Ø9.5

Ø12.7

 

Ø6.4

 

10 or less

 

 

 

 

 

 

 

 

Figure of Single

Figure of Simultaneous twin

 

Figure of Simultaneous triple

 

Indoor Unit

 

Indoor Unit

 

 

Indoor Unit

Indoor Unit

 

 

 

 

 

Indoor Unit

Indoor Unit

Compound pressure gauge

–101 kPa

(–76 cmHg)

Handle Low

Charge hose

(For R410A only)

Charge port

Pressure gauge

Gauge manifold valve

Handle High

(Keep fully closed)

Charge hose

(For R410A only)

Vacuum pump adapter for counter- flow prevention (For R410A only)

Vacuum

pump

Close Handle Low completely.

Turn OFF the vacuum pump.

Leave the vacuum pump as it is for 1 or 2 minutes, and check that the indicator of the compound pressure gauge does not return.

Open the valve stem or valve handle fully. (First, at liquid

side, then gas side)

Disconnect the charge hose from the charge port.

Distributor

6 AIR PURGING4

(Valve core (Setting pin))

 

 

 

 

Out

2

3

 

L

H

2

3

H

 

 

H

Packed valve at gas side

Tighten the valve and caps of the charge port securely.

￿Air Purge1

Distributor

110 –1

*1

Use the vacuum pump, vacuum pump adapter, and gauge

 

manifold correctly referring to the manuals supplied with each

 

tool before using them.

 

Check that the vacuum pump oil is filled up to the specified line

 

of the oil gauge.

*2

When air is not charged, check again whether the connecting

port of the discharge hose, which has a projection to push the valve core, is firmly connected to the charge port.

EN-18

18

19

19-EN
Page 110
Image 110
Toshiba RAV-SP1104AT8Z-E, RAV-SP1104AT8ZG-TR Air Purging, Refrigerant Pipe Length, Airtight test, Air Purge, EN-18, 19-EN