Toshiba RAV-SP1404AT8Z-TR, RAV-SP1104AT8ZG-TR Requirement, 129, Detachment, Attachment

Models: RAV-SP1404AT8Z-E RAV-SP1104AT8Z-E RAV-SP1404AT8ZG-E RAV-SP1404AT8-E RAV-SP1604AT8-TR RAV-SP1104AT8Z-TR RAV-SP1604AT8-E RAV-SP1404AT8-TR RAV-SP1604AT8Z-E RAV-SP1104AT8ZG-E RAV-SP1404AT8Z-TR RAV-SP1404AT8ZG-TR RAV-SP1104AT8-TR RAV-SP1104AT8ZG-TR

1 143
Download 143 pages 52.35 Kb
Page 129
Image 129
– 129 –

No. Part name

Procedure

Remarks

11 PMV coil

1. Detachment

Concave part

PMV main unit

 

1) Carry out work of item 1 of Q.

 

 

 

2)Turn the coil while pulling upward and then remove the coil from the PMV main unit.

2.Attachment

1)Surely match the positioning projection of

the coil with the concave part of PMV main unit and then fix it.

Positioning projection

PMV coil

12 Fan guard

1. Detachment

Fan guard

Bell mouth

Discharge

 

1) Carry out works of item 1 of Q and 1 of R.

 

 

 

port cabinet

REQUIREMENT

To prevent scratch on the product, carry out the work on cardboard, cloth, etc.

2)Remove the discharge port cabinet and then put on it so that the fan guard side directs downward.

3)Remove the hooking claws (8 positions) of the fan guard.

2. Attachment

Hooking claw

 

1)Push the hooking claws (8 positions) with hands from the front side to fix the claws.

REQUIREMENT

Check that all the hooking claws are fixed at the specified positions.

– 129 –

Page 129
Image 129
Toshiba RAV-SP1404AT8Z-TR, RAV-SP1104AT8ZG-TR, RAV-SP1104AT8-TR, RAV-SP1404AT8ZG-TR Requirement, 129, Detachment, Attachment