No.

Part name

Procedure

Remarks

10 Compressor

2. Mounting of compressor

 

Compressor lead

1) Mount the compressor in the reverse

Wrap the ferrite core with the compressor

(Continued)

procedure for removal.

lead wire for 1 time.

Compressor lead

 

 

 

 

NOTE

 

 

 

 

 

 

 

 

 

 

 

 

• After replacement of the compressor, be sure

 

 

 

 

to replace the compressor lead. (Repair part

 

 

 

 

code of compressor lead: 43160612)

 

 

 

 

In this time, wrap the ferrite core with the

 

 

 

 

compressor lead wire by 1 time.

 

 

Ferrite core

 

• As shown in the right figure, mount the

 

 

 

 

sound-insulation plate (rolling in, rolling out)

 

 

 

 

by passing through it between the

 

0 to 50

 

 

compressor and the piping, and between the

 

 

 

 

(Compressor lead positioning standard)

 

piping and the partition board.

 

Put the end of

Pass through sound-

 

• Fix TD sensor by the bundling band for heat-

 

 

 

sound-insulation

insulation plate

 

proof on the market via the pipe cover so that

 

plate (rolling out)

(rolling out) between

 

TD sensor does not directly come to contact

 

on the other end

suction pipe and

 

 

at this position.

header pipe.

 

with the discharge pipe.

 

 

 

 

 

 

 

 

 

 

 

 

 

3. Vacuuming

 

 

 

 

1) Connect the vacuum pump to the charge

 

Suction pipe

Header pipe

 

port and the check joint of the gas pipe valve

 

 

 

 

 

 

and then drive the vacuum pump.

 

 

 

 

2) Carry out vacuuming until the vacuum low

 

 

 

 

pressure gauge indicates 1 (mmHg).

 

Discharge pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

NOTE

 

Pass through sound-insulation plate

 

 

 

 

 

(rolling in) between compressor and

 

 

 

 

 

 

Before vacuuming, open PMV fully.

 

discharge pipe, suction pipe and then put

 

 

 

 

 

the end of sound-insulation plate on the

 

If PMV is closed, vacuum may be impossible

 

other end at this position.

 

between liquid pipe valve and PMV of the

 

There should be no clearance between

 

outdoor unit.

 

sound-insulation plate (upper) and sound-

 

 

 

 

 

insulation plate (rolling out).

 

 

 

 

 

 

Sound-insulation plate

Forced full-opening method of PMV

 

 

(upper)

 

 

 

Turn on the leakage breaker.

Turn on 1 and 3 of Dip switch SW804 on the

control P.C. board of the outdoor unit.

• Keep pushing SW801 on the control P.C. board of the outdoor unit for 1 second or more.

• After pushing SW801 for 1 second or more, turn

Cultural rivet

off the leakage breaker within 2 minutes.

 

4. Refrigerant charge

 

 

 

 

 

 

1) Add the refrigerant amount determined by

Sound-insulation plate

the pipe length from the charge port of the

(rolling out)

Insert one side

valve.

under cultural rivet.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SW804

SW801

– 128 –

Page 128
Image 128
Toshiba RAV-SP1404AT8ZG-TR, RAV-SP1104AT8ZG-TR, RAV-SP1104AT8-TR 128, Mounting of compressor, Vacuuming, Refrigerant charge