
Chapter 4 Replacement Procedures
Installing the top cover assembly
The following describes the procedure for installing the cover assembly.
1.Connect the Power FFC to the connector on the power board.
2.Secure the power board with the following screws.
∙ M2.0×3F FLAT BIND screw x2
3. Install the top cover assembly to the base assembly.
NOTE: Be careful not to catch the cables between cover assembly and base assembly.
4.Connect the touch pad FFC /LAN FFC/ Power FFC to the connector on the system board.
5.Install the Keyboard and Keyboard holder.
6.Secure the cover assembly with the following screws from the back and bottom of computer.
∙ | M2.0×2F | FLAT BIND screw | x3 |
∙ | M2.0×3F | FLAT BIND screw | x2 |
∙ | M2.0×4F | FLAT BIND screw | x9 |
∙ | M2.0×6F | FLAT BIND screw | x3 |
∙ | M2.5×8F | FLAT BIND screw | x2 |
Satellite T110 / Satellite Pro T110 / PORTEGE T110Maintenance Manual | 34 |