Trane TR200, Vertical Bypass/Non Bypass Panel Start Up, Electromechanical Bypass EMB2 Operation

Models: TR200 Vertical Bypass/Non Bypass Panel

1 86
Download 86 pages 30.73 Kb
Page 4
Image 4
4 Start Up

Contents

3.2.1 Lifting

4-3

3.2.2 Hoist or Overhead Lift

4-3

3.2.3 Forklift

4-3

3.2.4 Shipping Weights

4-3

3.3 Cooling

4-4

3.4 Electrical Installation

4-5

3.4.1 Component Identification & Customer Connection

4-7

3.4.2 Wire and Cable Access

4-15

3.4.3 Wire Size

4-19

3.4.4 Wire Type Rating

4-20

3.4.5 Terminal Tightening Torques

4-20

3.4.6 Input Line Connection

4-25

3.4.7 Motor Wiring

4-25

3.4.8 Grounding (Earthing)

4-26

3.4.9 Control Wiring

4-26

3.4.10 Serial Communication Bus Connection

4-27

3.4.11 Drive Control Terminals

4-28

4 Start Up

5-1

4.1.1 Inspection Prior to Start Up

5-2

4.1.2 Start Up Procedure

5-2

5 Electromechanical Bypass (EMB2) Operation

6-1

5.1.1 Typical Control Connections for Common HVAC Applications

6-1

5.1.2 EMB2 Auto Bypass

6-3

5.1.3 EMB2 Common Run/Stop

6-3

5.1.4 EMB2 Run Permissive

6-4

5.1.5 EMB2 Overload

6-4

5.1.6 EMB2 Safety Interlock

6-5

5.1.7 EMB2 Fire Mode

6-5

5.1.8 EMB2 Fault Reporting

6-5

5.1.9 EMB2 Switches

6-6

6 Electronically Controlled Bypass (ECB) Operation

7-1

6.1 Electronically Controlled Bypass (ECB) Operation

7-1

6.1.1 Overview

7-1

6.1.2 ECB Control Card

7-2

6.1.3 ECB Drive or Bypass Selection

7-5

6.1.4 ECB Programming

7-7

BAS-SVX49A-EN

Page 4
Image 4
Trane TR200 Start Up, Electromechanical Bypass EMB2 Operation, Electronically Controlled Bypass ECB Operation