Briggs & Stratton 01815-0 manual Fuel System Selection, Fuel Supply System, Servicing the Battery

Page 13

Briggs & Stratton Power Products Home Generator

Installation Manual

DANGER

Storage batteries give off explosive hydrogen gas during recharging.

Slightest spark will ignite hydrogen and cause explosion.

Battery electrolyte fluid contains acid and is extremely caustic.

Contact with battery contents will cause severe chemical burns.

A battery presents a risk of electrical shock and high short circuit current.

DO NOT dispose of battery in a fire.

DO NOT allow any open flame, spark, heat, or lit cigarette during and for several minutes after charging a battery.

DO NOT open or mutilate the battery.

Wear protective goggles, rubber apron, and rubber gloves.

Remove watches, rings, or other metal objects.

Use tools with insulated handles.

NOTE: With the battery installed and utility power available to the Automatic Transfer Switch, the battery receives a trickle charge whenever the engine is not running.This process may take up to 72 hours to fully charge a battery from 5 Volts.The trickle charge cannot be used to recharge a battery that is completely discharged.

5.Connect the negative battery cable to the negative battery terminal (indicated by NEGATIVE, NEG, or (-).

6.Ensure hardware on both positive and negative battery terminals is secure.

7.Reinstall the 15 Amp fuse in the control panel.

CAUTION

Installing the 15A fuse could cause the engine to start.

DO NOT install the 15 Amp fuse until all plumbing and wiring has been completed and inspected.

8.Set the generator's “AUTO/OFF/MANUAL” switch to AUTO.

Servicing the Battery

If it is necessary to service the battery, proceed as follows:

1.Set the generator's “AUTO/OFF/MANUAL” switch to OFF.

2.Remove the 15 Amp fuse from the control panel.

3.Service or replace battery as required.

4.Connect the red battery cable to the battery positive terminal (indicated by POSITIVE, POS, or (+).

5.Connect the negative battery cable to the negative battery terminal (indicated by NEGATIVE, NEG, or (-).

6.Ensure hardware on both positive and negative battery terminals is secure.

7.Reinstall the 15 Amp fuse in the control panel.

8.Set the generator's “AUTO/OFF/MANUAL” switch to AUTO.

Fuel Supply System

Ensure that all fuel pipe connections are tight, secure and without leaks.

Ensure that all gas line shutoff valves are OPEN and that adequate fuel pressure is available whenever automatic operation is desired.

FUEL SYSTEM SELECTION

The engine of your Home Standby Generator is factory calibrated to run on natural gas (NG). It may also be operated on liquefied petroleum (LP).There is no additional hardware/equipment required to switch between either fuel. However, LP fuel inlet pressure must be between

11 and 14 inches water column.

To configure the fuel system for LP use:

Set the AUTO/OFF/MANUAL switch to OFF.

Remove the 15 Amp fuse.

Connect the fuel transfer solenoid as follows:

1.Remove the “Oil Service” access door.

2.Join the two-pin electrical connector shown in Figure 12.

Figure 12 — Fuel Transfer Solenoid Connection

Push two

connectors

together

3.Reinstall the “Oil Service” access door.

Reinstall the 15 Amp fuse.

Set the AUTO/OFF/MANUAL switch to AUTO.

The system is now ready to operate automatically using LP fuel.With a fixed main jet for LP gas, there is no need to perform any engine adjustments for LP operation.

13

Image 13
Contents 10kW / 12kW Rated Installer Responsibilities Table of ContentsEquipment Description Customer ResponsibilitiesHazard Symbols and Meanings Important Safety RulesRotating Parts Electrical Shock Amp fuse Before working on the equipmentInstallation Procedures Lifting the Generator Fuel and Electrical Inlet DimensionsConduit Attachment AreaBattery Access DoorsInsert DoorTo Install an Access Door Installation Manual To Remove an Access DoorGaseous Fuel System To Home Standby From FuelFuel Pipe Sizing Fuel Consumption10ft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 80ft 90ft 100ft LoadKnow Your System Control Board Volt DC, .5 Amp Output Internal power supplyRemote LED Output To install the remote LED panel Fault Detection SystemGenerator AC Connection System Grounding the GeneratorBefore Initial START-UP Battery ConnectionSystem Control Panel Engine OilTo configure the fuel system for LP use Servicing the BatteryDo not dispose of battery in a fire Fuel System SelectionInstall the 15 Amp fuse in the control panel Engine AdjustmentInitial START-UP no Load Adjustment Nut Engine Cool-down TimerAutomatic Operation Sequence Utility Voltage Dropout SensorInstallation Inspection Setting Exercise TimerTo perform the Set Exercise procedure Physical Properties Butane Propane Natural Gas Fuel Comparison ChartWithdrawal Rate 32F 20F 10F 30F 40F Descripción DEL Equipo Tabla DE ContenidoResponsabilidades DEL Cliente Responsabilidades DEL InstaladorAdvertencia PrecauciónSímbolos de Peligro y Significados ExplosiónProcedimientos DE Instalación Elevación del Generador Dimensiones de la Entrada para Electricidad y CombustibleNPT 13.5Para Puertas de AccesoPara Retirar una Puerta de Acceso Entrada de CombustiblePara Instalar una Puerta de Acceso Sistema DE Combustible Gaseoso AdvertenciaFigura 19 Manómetro Instalado Transitoriamente Consumo de Combustible Dimensiones de la Cañería de CombustibleModelo Gas Natural Vapor de PL Gas Natural peso específico =Conozca LA Tarjeta DE Control DE SU Sistema Conexión a Tierra del Generador Sistema de Conexión de c.a. del GeneradorInterconexiones del Circuito de Control Sistema de Detección de FallasPanel de Control del Sistema Antes DEL Arranque Inicial DEL MotorAceite de Motor Conexión de la BateríaPeligro Para configurar el sistema de combustible para uso de LPSelección DEL Sistema DE Combustible Sistema de Suministro de CombustibleInstale el fusible de 15 Amperios en el panel de control Arranque Inicial SIN CargaFije el interruptor AUTO/OFF/MANUAL en la posición Del Regulador Ajuste del MotorCargue el generador al valor nominal de gas natural Secuencia DE Operación Automática Configuración DEL Temporizador DE PrácticaInspección Posterior a LA Instalación Propiedades físicas Butano Propano Gas natural Cuadro de Comparación de CombustiblesTasa de consumo 32F 20F 10F 30F 40F Guide dInstallation Responsabilités DE LinstallateurTable DES Matières Description DE LéquipementAvertissement Symboles de Danger et MoyensExplosion Feu Procédures Dinstallation Soulèvement de la Génératrice Directives Générales Concernant lEmplacementConnecteur de tuyauterie De combustible Portes dAccès Tuyau ici Tuyau fourni par linstallateurPour Pour enlever une porte daccèsLE Système DE Combustible Gazeux Avertissement Pour installer une porte daccèsIl faudrait inclure une sortie pour manomètre Le groupe électrogène a été réglé en usine pourGrosseur du Tuyau de Combustible Consommation de CombustibleModèle Gas Naturel Vapeur PL Gaz Naturel densité = 0,65Sortie de panneau DEL à distance Tableau de Commande du Système Interconnexions du Circuit de CommandeSystème de Branchement C.A. de la Génératrice Mise à la Masse de la GénératriceHuile à Moteur Avant LE Démarrage Initial DU MoteurBranchement de la Batterie Système dAlimentation en Combustible Sélection DU Système DE CombustibleRéglez linterrupteur AUTO/OFF/MANUAL sur Auto Entretien de la BatterieRéglage du Moteur Démarrage Initial SansRéglez linterrupteur AUTO/OFF/MANUAL sur Manual Du RégulateurSéquence DE Fonctionnement Automatique Vérification InstallationRéglage DE LA Minuterie DE Cycle Dexercice Propriétés physiques Butane Propane Gaz naturel Charte de Comparaison des CombustiblesDensité 31,26 Poids† Indice d’octane Recherche