Briggs & Stratton 01815-0 manual Gaseous Fuel System, Installation Manual To Remove an Access Door

Page 7

Briggs & Stratton Power Products Home Generator

Installation Manual

To Remove an Access Door:

1.Insert key into lock of access door you wish to remove and turn one quarter turn clockwise.

NOTE: The key is retained in the lock when the locks are open.

2.Grasp door’s lift handle and pull door upwards until security pins are free of lower base.

3.With the security pins free, pull the lift handle outward (away) from the unit while pulling the door down and out of the upper door channel.The door will come free of the generator enclosure.

The Battery door does not have a lock and the Air Intake door does not have a lock or lift handle.The Air Intake door is opened by lifting on the louvers instead of a lift handle. However, you must remove the door lock screws, found directly above the center of the doors.

WARNING

Running engines produce heat.Temperature of exhaust port and nearby areas can reach or exceed 600°F (316°C).

Severe burns can occur on contact.

DO NOT touch hot surfaces.

Allow equipment to cool before touching.

To Install an Access Door:

1.Support door by grasping lift handle or louver. Guide top of door into generator enclosure.

2.Lift door up into its upper channel until security pins clear sill of enclosure.

3.Push lower half of door into door recess until it is flush with sides.

4.Seat door by pushing it down until rubber coated security pins engage and door rests on mounting sill.

5.If installing a lockable door, turn key one quarter turn counterclockwise. Remove key.

6.If installing air intake or battery door, replace the door lock screw.

Check to ensure that all the rubber and foam vibration dampers remain in place.This will minimize vibration noise.

THE GASEOUS FUEL SYSTEM

WARNING

Propane and Natural Gas is extremely flammable and explosive.

Fire or explosion can cause severe burns or death.

LP gas is heavier than air and will settle in low areas.

Natural gas is lighter than air and will collect in high areas.

The slightest spark can ignite these fuels and cause an explosion.

The information provided below is to assist gaseous fuel system technicians in planning installations. In no way should this information be interpreted to conflict with applicable fuel gas codes. Consult with your local fuel supplier or Fire Marshall if questions or problems arise.

TO THE INSTALLER: Consult with the Home Standby Generator owner(s) and convey any technical considerations that might affect their installation plans before applying these general guidelines.

The following general rules apply to gaseous fuel system piping:

The piping should be of a material that conforms to federal and local codes, rigidly mounted and protected against vibration.

Piping should be protected from physical damage where it passes through flower beds, shrub beds, and other cultivated areas where damage could occur.

Install the flexible, gaseous hose (supplied) between the Home Standby Generator Fuel Inlet port and rigid piping to prevent thermal expansion or contraction from causing excessive stress on the piping material.

NOTE: Where local conditions include earthquake, tornado, unstable ground, or flood hazards, special consideration shall be given to increase strength and flexibility of piping supports and connections.

CAUTION

The supplied flexible gaseous pipe is not to be installed underground or in contact with the ground.

The entire flexible gaseous pipe must be visible for periodic inspection and must not be concealed within, contact, or run through any wall, floor, or partition.

7

Image 7
Contents 10kW / 12kW Rated Customer Responsibilities Table of ContentsInstaller Responsibilities Equipment DescriptionAmp fuse Before working on the equipment Important Safety RulesHazard Symbols and Meanings Rotating Parts Electrical Shock Installation Procedures Area Fuel and Electrical Inlet DimensionsLifting the Generator Conduit AttachmentDoor Access DoorsBattery InsertTo Install an Access Door Installation Manual To Remove an Access DoorGaseous Fuel System To Home Standby From FuelLoad Fuel ConsumptionFuel Pipe Sizing 10ft 15ft 20ft 30ft 40ft 50ft 60ft 70ft 80ft 90ft 100ftKnow Your System Control Board Volt DC, .5 Amp Output Internal power supplyRemote LED Output Grounding the Generator Fault Detection SystemTo install the remote LED panel Generator AC Connection SystemEngine Oil Battery ConnectionBefore Initial START-UP System Control PanelFuel System Selection Servicing the BatteryTo configure the fuel system for LP use Do not dispose of battery in a fireInstall the 15 Amp fuse in the control panel Engine AdjustmentInitial START-UP no Load Utility Voltage Dropout Sensor Engine Cool-down TimerAdjustment Nut Automatic Operation SequenceInstallation Inspection Setting Exercise TimerTo perform the Set Exercise procedure Physical Properties Butane Propane Natural Gas Fuel Comparison ChartWithdrawal Rate 32F 20F 10F 30F 40F Responsabilidades DEL Instalador Tabla DE ContenidoDescripción DEL Equipo Responsabilidades DEL ClienteExplosión PrecauciónAdvertencia Símbolos de Peligro y SignificadosProcedimientos DE Instalación 13.5 Dimensiones de la Entrada para Electricidad y CombustibleElevación del Generador NPTEntrada de Combustible Puertas de AccesoPara Para Retirar una Puerta de AccesoPara Instalar una Puerta de Acceso Sistema DE Combustible Gaseoso AdvertenciaFigura 19 Manómetro Instalado Transitoriamente Gas Natural peso específico = Dimensiones de la Cañería de CombustibleConsumo de Combustible Modelo Gas Natural Vapor de PLConozca LA Tarjeta DE Control DE SU Sistema Sistema de Detección de Fallas Sistema de Conexión de c.a. del GeneradorConexión a Tierra del Generador Interconexiones del Circuito de ControlConexión de la Batería Antes DEL Arranque Inicial DEL MotorPanel de Control del Sistema Aceite de MotorSistema de Suministro de Combustible Para configurar el sistema de combustible para uso de LPPeligro Selección DEL Sistema DE CombustibleInstale el fusible de 15 Amperios en el panel de control Arranque Inicial SIN CargaFije el interruptor AUTO/OFF/MANUAL en la posición Del Regulador Ajuste del MotorCargue el generador al valor nominal de gas natural Secuencia DE Operación Automática Configuración DEL Temporizador DE PrácticaInspección Posterior a LA Instalación Propiedades físicas Butano Propano Gas natural Cuadro de Comparación de CombustiblesTasa de consumo 32F 20F 10F 30F 40F Description DE Léquipement Responsabilités DE LinstallateurGuide dInstallation Table DES MatièresAvertissement Symboles de Danger et MoyensExplosion Feu Procédures Dinstallation Soulèvement de la Génératrice Directives Générales Concernant lEmplacementConnecteur de tuyauterie De combustible Pour enlever une porte daccès Tuyau ici Tuyau fourni par linstallateurPortes dAccès PourLE Système DE Combustible Gazeux Avertissement Pour installer une porte daccèsIl faudrait inclure une sortie pour manomètre Le groupe électrogène a été réglé en usine pourGaz Naturel densité = 0,65 Consommation de CombustibleGrosseur du Tuyau de Combustible Modèle Gas Naturel Vapeur PLSortie de panneau DEL à distance Mise à la Masse de la Génératrice Interconnexions du Circuit de CommandeTableau de Commande du Système Système de Branchement C.A. de la GénératriceHuile à Moteur Avant LE Démarrage Initial DU MoteurBranchement de la Batterie Entretien de la Batterie Sélection DU Système DE CombustibleSystème dAlimentation en Combustible Réglez linterrupteur AUTO/OFF/MANUAL sur AutoDu Régulateur Démarrage Initial SansRéglage du Moteur Réglez linterrupteur AUTO/OFF/MANUAL sur ManualSéquence DE Fonctionnement Automatique Vérification InstallationRéglage DE LA Minuterie DE Cycle Dexercice Poids† Indice d’octane Recherche Charte de Comparaison des CombustiblesPropriétés physiques Butane Propane Gaz naturel Densité 31,26
Related manuals
Manual 48 pages 28.98 Kb