Extron electronic PVS 305SA manual Cut the ceiling tile, Preliminary safety hardware installation

Page 16

Installation — Stage One, cont’d

4.Cut the ceiling tile

a.Mark the location of the PCM 340 on the T-frame. This aids putting it back in the correct location when the tile is replaced.

T Mark the screen direction on back of the tile (e.g. with an arrow or “to front”) to help orientation of tile when replacing it after cutting.

b.Measure the distances X and Y (see figure) from the inner vertical section of the front and left T-frame runners to the center of the Pipe Adapter Plate.

c.Using the X and Y dimensions, mark and cut a hole for the slotted pipe in the ceiling tile.

TPlace the tile on a box and mark the hole’s center on the underside of the tile. Use a hole saw bit to start to cut the hole by hand (turning bit counter clockwise) to avoid damaging the tile. When the drill bit is through the tile, turn the tile over and finish cutting from the top side.

X"

Y"

T-bar

Minimum and

Maximum

Throw Distance Marks

4b Take measurements with the PCM 340 on the T-frame

Top Side of Tile

Underside of Tile

4c Mark and start cutting the hole on the underside. Finish on the top side.

5. Preliminary safety hardware installation

a. Mark and drill holes at 10 degrees out from vertical for each turnbuckle. Drill a fifth hole directly centered above the PCM 340 for the safety cable.

b. Install an appropriate anchors or lag eye bolt for the structural ceiling into each drilled hole.

5a Mark structural ceiling for lag eye bolt installation

2-5 PoleVault Systems Installation • Installation — Stage 1

Image 16
Contents Installation Guide PoleVault SystemsPrecautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesLocation of source devices Cabling obstaclesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Stage One Install the Screen and Projector PoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstallation Stage One, cont’d Install projector to verify locationMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Verify the image location2e Attach the bracket to the projector Horizontal offsetPreliminary safety hardware installation 5a Mark structural ceiling for lag eye bolt installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount installation Secure the Projector Drop Ceiling Mount to the ceiling7a Attach turnbuckles at the corners 7c Hand tighten the turnbucklesInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller Installation Stage Two, cont’d CablesIR/RS-232 communications cable control cable RS-232 or to an IR emitterInstall the mud rings 1d Features for mud ring installationMLC 104 IP Plus mud ring 1c Insert the mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling SpeakersInstallation Stage Three, cont’d Install the speaker on the drop ceiling2h Attach safety cable Cut ceiling tileTerminate the speaker cable for the PVS switcher Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchStage Four Install the PMK 550 and the PVS 305SA This stage covers installing the devices shown belowPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Installation Stage Four, cont’d Pull the cables at the switcher locationSwitcher and projector cable overview 2b Gather the cables, pass them down the pipeFinish installing the Pole Mount kit BControl/power cable from the MLC 104 IP Plus4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Installation Stage Five, cont’d Configure the system Global Configurator3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system Final installation Adjust the configuration as necessaryWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationOptional Accessory Installation VoiceLift System Align the arrows on the housing rim and the dome tabAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOptional Accessory Installation Priority Page Sensor Kit Open the sensor and loop a wire around the sensorPriority Page Sensor Kit included parts UL-compliant junction box and coverTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Commands PVS 305SA specific symbol definitionsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West