Extron electronic PVS 305SA Test the system, 3c Check that an image is present, adjust as needed

Page 37

3.Test the system

a.Connect all the input devices (e.g., PC, DVD, document camera, etc.) to the transmitters and power up the input devices. Check that power and signal are present at the transmitters. The LEDs light red when only power is present and light green when power and a signal are present.

b.At the MLC 104 IP Plus, turn on the Display. Once the the projector is powered up, check with an active video source (PC or DVD) that a good image is shown on screen.

NCheck the MLC controller configuration and wiring if the display does not turn on.

c.Properly align and adjust projector settings as follows:

Adjust the rotation (yaw) by turning the unit on the projector pole. Secure the location by tightening the two set screws on the UPB mount plate to the pole

(see below).

Loosen all pivot screws and adjust the vertical angle

(pitch) of the projector. Lock down the four adjustment screws.

Adjust the horizontal tilt (roll) of the projector. Lock down all the remaining adjustment and pivot screws.

Adjust the image settings on the projector (zoom, focus, keystone, brightness, contrast, etc.). Refer to the manufacturer’s user manual.

3b Connect and turn on the input devices,

and turn on the display at the MLC

Vertical

Angle Adjustment

and Pivot

Point Screws

Horizontal Angle

Adjustment and

Pivot Point Screws

Tighten these 2 set screws (one each side) to lock the UPB onto the pole.

Adjuster

Plate Locking Screws (4)

Pitch/Vertical Angle

Yaw/RotationRoll/Tilt

3c Check that an image is present, adjust as needed.

PoleVault Systems Installation • Installation — Stage 5

2-26

Image 37
Contents PoleVault Systems Installation GuideSafety Instructions English PrecautionsConsignes de Sécurité Français Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice Introduction, contd PoleVault System installation and wiring overviewPoleVault Systems Installation Introduction Planning Typical classroom installationRoom layout RoomIntroduction Planning, cont’d Example classroom installationLocation of the screen and projector ADA overhead and side clearance requirementsLocation of MediaLink Controller and Wall Plates Example classroom with four speaker installationLocation of source devices Cabling obstaclesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation PoleVault Systems Installation Installation Stage Stage One Install the Screen and ProjectorPCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstall projector to verify location Installation Stage One, cont’dMark screen location 1a Mark the screen locationVerify the image location 2f Slide and lock the projector onto the adjuster plate2e Attach the bracket to the projector Horizontal offset5a Mark structural ceiling for lag eye bolt installation Preliminary safety hardware installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameSecure the Projector Drop Ceiling Mount to the ceiling Finish Projector Drop Ceiling Mount installation7a Attach turnbuckles at the corners 7c Hand tighten the turnbucklesInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller Cables Installation Stage Two, cont’dIR/RS-232 communications cable control cable RS-232 or to an IR emitter1d Features for mud ring installation Install the mud ringsMLC 104 IP Plus mud ring 1c Insert the mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location MLC 104 IP Plus controller Install wall platesWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher Connect the MLC to the projector with 4c Connect to the LAN using a CAT 5 cableAn RS-232 cable or IR emitter cable, as Appropriate4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersInstall the speaker on the drop ceiling Installation Stage Three, cont’d2h Attach safety cable Cut ceiling tilePole captive screw connector Terminate the speaker cable for the PVS switcherStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchThis stage covers installing the devices shown below Stage Four Install the PMK 550 and the PVS 305SAPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base platePull the cables at the switcher location Installation Stage Four, cont’dSwitcher and projector cable overview 2b Gather the cables, pass them down the pipeBControl/power cable from the MLC 104 IP Plus Finish installing the Pole Mount kit4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4d Cable the projector 4b Reattach UPB bracket and 4c projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Configure the system Global Configurator Installation Stage Five, cont’d3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system Adjust the configuration as necessary Final installationWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationAlign the arrows on the housing rim and the dome tab Optional Accessory Installation VoiceLift SystemAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOpen the sensor and loop a wire around the sensor Optional Accessory Installation Priority Page Sensor KitPriority Page Sensor Kit included parts UL-compliant junction box and coverTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPVS 305SA specific symbol definitions SIS CommandsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West