Extron electronic PVS 305SA manual Installation Stage One, cont’d, Mark screen location

Page 14

Installation — Stage One, cont’d

1.Mark screen location

a. Mark the center line and the outer edges of the screen.

TWhen marking the location of screens, devices, or the site for installing transmitters and MediaLink control devices, use painters tape to avoid wall surface damage.

When marking the center line of the screen,

1a Mark the screen location

where possible, keep it aligned with the center of the ceiling tile. This makes the projector installation and alignment easier.

b.Mark any structural studs, utility pipes, conduits, or fire-breaks before drilling the hardware holes. Do not drill the holes at this time.

2.Install projector to verify location

a.Remove the ceiling tiles, and mark the maximum and minimum throw distances on the T-frame. Refer to the projector manufacturer’s installation manual for more information.

b.Place the PCM 340 over the T-frame, between the two marks. Lightly tighten the T-frame securing screws. The T-frame screws can be used on the outside or the inside to secure the PCM to the T-frame.

NPlace the PCM 340 on the T-frame so that the pipe adapter slides left to right in relation to the proposed screen location, rather than towards and away from it. This makes aligning/centering the image easier.

c.Slide the slotted pipe up into the pipe adapter. Adjust to the desired height and align the location holes and pipe holes. Insert the location screw, lightly tightening it down using a 5/32 inch hex wrench. Insert and lightly tighten down the set screws onto the pipe. Do not overtighten as the pipe is removed and replaced later during installation.

d.Take the UPB 25 and back out the set screws using a 3/32 inch hex wrench on the top portion of the adjuster plate (see A below), and then screw the plate onto the base of the pipe. Align it so the security flange is at the rear.

a

Set Screws (2)

 

Adjuster

Loosen the four Adjuster Plate

Plate

Locking Screws and slide the

 

Adjuster Plate away from the

 

Projector Bracket

 

Projectorb

 

Bracket

Security flange

 

 

Adjuster Plate

 

Locking Screws (4)

Minimum/Maximum

Throw Distance Marks

PCM 340

2b Place the PCM 340 on the T-bar

Align Pipe holes with location screw holes.

Insert location screw and secure.

2c Insert and secure the slotted pipe

2d Screw the adjuster plate onto the base of the pipe.

2-3 PoleVault Systems Installation • Installation — Stage 1

Image 14
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbuckles8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations Install wall plates MLC 104 IP Plus controller4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Installation Stage Five, cont’d Configure the system Global ConfiguratorTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and cover4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West