Extron electronic PVS 305SA manual Introduction, FCC Class B Notice

Page 3

Introduction

FCC Class B Notice

This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that the interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures:

Reorient or relocate the receiving antenna.

Increase the separation between the equipment and receiver.

Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.

Consult the dealer or an experienced radio/TV technician for help.

NThis unit was tested with shielded cables on the peripheral devices. Shielded cables must be used with the unit to ensure compliance.

Overview

This guide covers the installation of the Extron PoleVault® System in a drop ceiling room with a wood or concrete structural ceiling. If the location has a concrete or beam style ceiling, alternative ceiling mounts can be obtained separately from Extron (see 2c, "Optional items", later in this chapter).

It is assumed that the installer has some knowledge and experience of A/V, electrical, or electronic device installation. This guide takes the A/V installer through the steps for installation and connection of each of the system’s component parts.

It may be that the locations for the devices (e.g., wall plates, projector, and screen) have been pre-determined. However, some room installation examples are given to help in installations where final location is yet to be determined.

The PoleVault System

Extron PoleVault Systems are easy-to-use, network-enabled, all-inclusive packages, making them ideal for single-projector K-12 classrooms. PoleVault Systems use economical twisted pair cables for transmitting signals and include network connectivity for Web-based asset management, monitoring, and control.

NThe hardware and devices listed on the inventory pages have detailed safety information, installation, set-up, and configuration instructions, and should be referred to as needed.

For operation and setup of the projector, screen, and input devices, refer to the relevant manufacturer's manuals supplied with those devices.

A PoleVault System Installation video is viewable online at www.extron.com. This video is also a step by step guide to installing PoleVault System and is useful for first-time installations.

PoleVault Systems Installation • Introduction

1-1

Image 3
Contents PoleVault Systems Installation GuideSicherheitsanleitungen Deutsch PrecautionsSafety Instructions English Consignes de Sécurité FrançaisPoleVault Systems Installation Introduction IntroductionFCC Class B Notice Introduction, contd PoleVault System installation and wiring overviewRoom Typical classroom installationPoleVault Systems Installation Introduction Planning Room layoutADA overhead and side clearance requirements Example classroom installationIntroduction Planning, cont’d Location of the screen and projectorCabling obstacles Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Location of source devicesIntroduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d Optional installation hardware Introduction Inventory Overview, cont’dItems not included Installation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Slotted Pipe Supplied with PCM Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage PCM 340 Projector Drop Ceiling Mount1a Mark the screen location Installation Stage One, cont’dInstall projector to verify location Mark screen locationHorizontal offset 2f Slide and lock the projector onto the adjuster plateVerify the image location 2e Attach the bracket to the projector4b Take measurements with the PCM 340 on the T-frame Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation Cut the ceiling tile7c Hand tighten the turnbuckles Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7a Attach turnbuckles at the cornersInstall the electrical box if required Install the Screen8a Install Raco box and plaster ring Stage Two Install the Wall Plates and MLC 104 IP Plus This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller RS-232 or to an IR emitter Installation Stage Two, cont’dCables IR/RS-232 communications cable control cable1c Insert the mud ring Install the mud rings1d Features for mud ring installation MLC 104 IP Plus mud ringSignal Cable Label color Pull the cables at the input locations2c Pull the cables at each location MLC 104 IP Plus controller Install wall platesInstall MediaLink Controller Wire stripping lengths4a Connecting the MLC to the switcher Appropriate 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with An RS-232 cable or IR emitter cable, as4e Secure the MLC 104 IP Plus to the mud ring Connections made to the MLC 104 IP PlusFF 120 Flat Field Ceiling Speakers Stage Three Install the FF 120 Ceiling SpeakersCut ceiling tile Installation Stage Three, cont’dInstall the speaker on the drop ceiling 2h Attach safety cableTo terminate the cable, strip the end of the cable 0.2 inch Terminate the speaker cable for the PVS switcherPole captive screw connector Stereo or dual mono output using parallel speaker wiringPMK 550 Pole Mount Kit Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PVS 305SA PoleVault SwitcherPoleVault Systems Installation Installation Stage 4 Install the PMK 550 base plate2b Gather the cables, pass them down the pipe Installation Stage Four, cont’dPull the cables at the switcher location Switcher and projector cable overviewConnect the cables as follows to the PVS 305SA Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher4d Cable the projector 4b Reattach UPB bracket and 4c projectorStage Five Configure the Switcher and the System Configure the switcher MLS Switcher Configuration programGlobal configurator software Configure the system Global Configurator Installation Stage Five, cont’dLoosen all pivot screws and adjust the vertical angle 3c Check that an image is present, adjust as neededTest the system 3d Test the MLC configuration Final installationAdjust the configuration as necessary Where installed, if necessary, adjust the sensitivityPlug VoiceLift cable into PVS 305SA Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Attach the Z bracket to the ceiling tile and the back plateUL-compliant junction box and cover Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor Priority Page Sensor Kit included partsTesting and Adjustment Procedure Typical paging system with the PVS 305SA switcher4 Sensitivity knob adjustment Reference Information PoleVault Systems Installation Reference InformationLbs 0.1 kg Wall or furniture mountable with included Decora wall plateExtron PCM Reference Information, cont’dPoleVault Systems Installation Basic SIS Commands SIS CommandsPVS 305SA specific symbol definitions SIS Command/Response Table Ascii TelnetExtron USA West