Extron electronic PVS 305SA manual Introduction Planning, cont’d, Example classroom installation

Page 6

Introduction — Planning, cont’d

Lighting

Type and control (important for projector image viewing)

Ambient light from windows

Windows

TV / VCR / DVD Inputs

Student Desks

Speaker

Location

Projector/Switcher

Location

 

MLC Controller

 

Location

 

Teacher’s Desk

PVT A/V Wallplate

Screen/White Board

Location

Location

Example classroom installation

b.Location of the screen and projector

Proposed screen location

Normally located at the front center of the room (not covering fire alarm strobes when screen is lowered)

Dimensions and type of screen (maximum image size, motorized or hanging screen)

Proposed projector location

Aligned with center of the screen and not an obstruction to viewing

Projector's throw distance (maximum and minimum limits to the screen) of the image

Horizontal offset (horizontal distance from the center of the lens to the center of the projector)

Vertical offset of the projected image (height relationship between the projector and the screen)

Projector angle (image projected up, down, or horizontal to screen)

Power source for the projector: existing and accessible or needing installation

Projector weight. The Universal Projector Bracket (UPB 25) supports a maximum weight of 25 lbs.

Overhead clearances (refer to a copy of "ADA Standards for Accessible Design", "Section 4-4", "Head Room" for ADA requirements)

80"

(203 cm)

Min

4"

(10 cm)

Max

Greater than

27"

(68.5 cm)

Walking Parallel to a Wall (ADA referenced figure 8a, redrawn)

ADA overhead and side clearance requirements

Viewing obstructions

Pillars, furniture etc., window locations for glare reduction, obstructions between projector and screen

1-4 PoleVault Systems Installation • Introduction — Planning

Image 6
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesIntroduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d Optional installation hardware Introduction Inventory Overview, cont’dItems not included Installation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbucklesInstall the electrical box if required Install the Screen8a Install Raco box and plaster ring Stage Two Install the Wall Plates and MLC 104 IP Plus This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ringSignal Cable Label color Pull the cables at the input locations2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerInstall MediaLink Controller Wire stripping lengths4a Connecting the MLC to the switcher An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorStage Five Configure the Switcher and the System Configure the switcher MLS Switcher Configuration programGlobal configurator software Installation Stage Five, cont’d Configure the system Global ConfiguratorLoosen all pivot screws and adjust the vertical angle 3c Check that an image is present, adjust as neededTest the system Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and coverTesting and Adjustment Procedure Typical paging system with the PVS 305SA switcher4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West