Installation — Stage Two, cont’d

The connections between the MLC 104 IP Plus and the PVS 305SA switcher should look like the figure at right.

e.Sliding the cables into the opening, secure the

MLC 104 IP Plus to the mud ring with the provided machine screws.

N15779

1A RGB

2A RGB

3A RGB

4A RGB

 

17TT

 

LINE OUT

AMPLIFIED AUDIO OUT

 

 

US

 

 

DO NOT

 

 

 

 

 

 

 

 

AUDIO/VIDEO

 

 

GROUND

 

 

 

 

I

 

 

 

LISTED

APPARATUS

 

 

OR SHORT

 

 

2/4/8

 

 

 

 

 

 

 

 

SPEAKER

 

 

Ohms

POWER

N

 

 

 

OUTPUTS

VOICELIFT

L

R

OUTPUTS

 

 

 

P

 

 

RGB

VIDEO

RECEIVER

CLASS 2 WIRING

L

R

 

 

U

 

 

 

 

 

L

R

10V

50mA

CONTROL

 

T

 

 

 

 

 

 

 

 

 

Tx Rx IR

12V

 

S

 

 

 

 

 

 

 

 

 

 

 

12V

1B RGB 2B RGB

3B RGB

4B RGB

AUX AUDIO

PAGING

RS-232 MLC/IR

5A MAX

 

/VIDEO

/VIDEO

INPUT 5

SENSOR VOL/MUTE

 

PVS 305SA Switcher Rear Panel

TCP/IP

 

 

4a

 

 

 

 

 

RS-232

 

 

Network

4c CAT 5 Cable

 

 

 

and Power

 

 

 

 

LAN

PRESS TAB WITH

 

 

4b RS-232 Control

TWEEKER TO REMOVE

 

 

 

 

 

 

 

 

 

Tx Rx GROUND OUTIR

OUT+12V GROUND CM IRIN SCP

1 2 3 GROUND

Rx

Tx

GROUND

GROUND +12VIN

 

 

 

 

A

B

 

 

 

DISPLAY

A B C D E

DIGITAL

MLS

 

POWER

 

RS-232/IR

COMM LINK

I/O

RS-232

12V

Projector

 

 

 

 

 

 

 

MLC 104 IP Plus Right Side Panel

Connections made to the MLC 104 IP Plus

Extron

MR 200

Modular Mud Ring

Rotate locking arm and insert into wall opening.

 

1

DISPLAY

VCR

2

 

D

OFF

DV

ON

3

 

PC

VOLUME

4

 

CONFIG

IP

Plus

Extron

104

MLC

MLC 104 IP Plus

 

 

Extron

4e Secure the MLC 104 IP Plus to the mud ring

2-15 PoleVault Systems Installation • Installation — Stage 2

Image 26
Contents Installation Guide PoleVault SystemsConsignes de Sécurité Français PrecautionsSafety Instructions English Sicherheitsanleitungen DeutschFCC Class B Notice PoleVault Systems Installation IntroductionIntroduction PoleVault System installation and wiring overview Introduction, contdRoom layout Typical classroom installationPoleVault Systems Installation Introduction Planning RoomLocation of the screen and projector Example classroom installationIntroduction Planning, cont’d ADA overhead and side clearance requirementsLocation of source devices Example classroom with four speaker installationLocation of MediaLink Controller and Wall Plates Cabling obstaclesIncluded items Introduction Inventory OverviewInventory PoleVault System Devices and Hardware, cont’d Items not included Optional installation hardwareIntroduction Inventory Overview, cont’d Installation tools PoleVault Systems Installation Installation Installation OverviewOutline of installation steps PCM 340 Projector Drop Ceiling Mount Stage One Install the Screen and ProjectorPoleVault Systems Installation Installation Stage Slotted Pipe Supplied with PCMMark screen location Installation Stage One, cont’dInstall projector to verify location 1a Mark the screen location2e Attach the bracket to the projector 2f Slide and lock the projector onto the adjuster plateVerify the image location Horizontal offsetCut the ceiling tile Preliminary safety hardware installation5a Mark structural ceiling for lag eye bolt installation 4b Take measurements with the PCM 340 on the T-frame7a Attach turnbuckles at the corners Finish Projector Drop Ceiling Mount installationSecure the Projector Drop Ceiling Mount to the ceiling 7c Hand tighten the turnbuckles8a Install Raco box and plaster ring Install the electrical box if requiredInstall the Screen MLC 104 IP Plus MediaLink Controller Stage Two Install the Wall Plates and MLC 104 IP PlusThis stage involves installing the devices shown below IR/RS-232 communications cable control cable Installation Stage Two, cont’dCables RS-232 or to an IR emitterMLC 104 IP Plus mud ring Install the mud rings1d Features for mud ring installation 1c Insert the mud ring2c Pull the cables at each location Signal Cable Label colorPull the cables at the input locations Install wall plates MLC 104 IP Plus controller4a Connecting the MLC to the switcher Install MediaLink ControllerWire stripping lengths An RS-232 cable or IR emitter cable, as 4c Connect to the LAN using a CAT 5 cableConnect the MLC to the projector with AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling Speakers2h Attach safety cable Installation Stage Three, cont’dInstall the speaker on the drop ceiling Cut ceiling tileStereo or dual mono output using parallel speaker wiring Terminate the speaker cable for the PVS switcherPole captive screw connector To terminate the cable, strip the end of the cable 0.2 inchPVS 305SA PoleVault Switcher Stage Four Install the PMK 550 and the PVS 305SAThis stage covers installing the devices shown below PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Switcher and projector cable overview Installation Stage Four, cont’dPull the cables at the switcher location 2b Gather the cables, pass them down the pipe4a Connect the cables to the switcher Finish installing the Pole Mount kitBControl/power cable from the MLC 104 IP Plus Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorGlobal configurator software Stage Five Configure the Switcher and the SystemConfigure the switcher MLS Switcher Configuration program Installation Stage Five, cont’d Configure the system Global ConfiguratorTest the system Loosen all pivot screws and adjust the vertical angle3c Check that an image is present, adjust as needed Where installed, if necessary, adjust the sensitivity Final installationAdjust the configuration as necessary 3d Test the MLC configurationAttach the Z bracket to the ceiling tile and the back plate Optional Accessory Installation VoiceLift SystemAlign the arrows on the housing rim and the dome tab Plug VoiceLift cable into PVS 305SAPriority Page Sensor Kit included parts Optional Accessory Installation Priority Page Sensor KitOpen the sensor and loop a wire around the sensor UL-compliant junction box and cover4 Sensitivity knob adjustment Testing and Adjustment ProcedureTypical paging system with the PVS 305SA switcher PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Command/Response Table Ascii Telnet SIS CommandsPVS 305SA specific symbol definitions PoleVault Systems Installation Basic SIS CommandsExtron USA West