Extron electronic PVS 305SA manual Installation Stage Five, cont’d

Page 36

Installation — Stage Five, cont’d

2.Configure the system — Global

Configurator

a.Download and install Extron’s Global Configurator (GC) configuration program (available at www.extron.com) on the laptop or PC

b.Ensure the PC and the MLC 104 IP Plus are connected to the LAN.

NIf this is not possible, connect a 2.5 mm TRS configuration cable (part # 70-335-01) to the PC and to the front panel configuration port of the MLC 104 IP Plus.

c.Launch the Global Configurator program. Click on Help, then Contents (or press F1).

d.Select the MLC 104 IP Plus/PoleVault system from the drop-down box. Follow the instructions on the help page.

e.To move to the next page (as shown in the yellow box, figure 2e), click the NEXT button above the drop-down box. Repeat as needed, following the instructions on the pages to configure the MLC 104 IP Plus, as needed.

2a Load Global Configurator software

2c Launch Global Configurator

2d Select MLC 104 IP Plus/PoleVault System

2e Configure the MLC 104 IP Plus

2-25 PoleVault Systems Installation • Installation — Stage 5

Image 36
Contents Installation Guide PoleVault SystemsPrecautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschPoleVault Systems Installation Introduction IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesLocation of source devices Cabling obstaclesIntroduction Inventory Overview InventoryIncluded items PoleVault System Devices and Hardware, cont’d Optional installation hardware Introduction Inventory Overview, cont’dItems not included Installation tools Installation Overview Outline of installation stepsPoleVault Systems Installation Installation Stage One Install the Screen and Projector PoleVault Systems Installation Installation StagePCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstallation Stage One, cont’d Install projector to verify locationMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Verify the image location2e Attach the bracket to the projector Horizontal offsetPreliminary safety hardware installation 5a Mark structural ceiling for lag eye bolt installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount installation Secure the Projector Drop Ceiling Mount to the ceiling7a Attach turnbuckles at the corners 7c Hand tighten the turnbucklesInstall the electrical box if required Install the Screen8a Install Raco box and plaster ring Stage Two Install the Wall Plates and MLC 104 IP Plus This stage involves installing the devices shown belowMLC 104 IP Plus MediaLink Controller Installation Stage Two, cont’d CablesIR/RS-232 communications cable control cable RS-232 or to an IR emitterInstall the mud rings 1d Features for mud ring installationMLC 104 IP Plus mud ring 1c Insert the mud ringSignal Cable Label color Pull the cables at the input locations2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerInstall MediaLink Controller Wire stripping lengths4a Connecting the MLC to the switcher 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling SpeakersInstallation Stage Three, cont’d Install the speaker on the drop ceiling2h Attach safety cable Cut ceiling tileTerminate the speaker cable for the PVS switcher Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchStage Four Install the PMK 550 and the PVS 305SA This stage covers installing the devices shown belowPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Installation Stage Four, cont’d Pull the cables at the switcher locationSwitcher and projector cable overview 2b Gather the cables, pass them down the pipe Finish installing the Pole Mount kit BControl/power cable from the MLC 104 IP Plus 4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorStage Five Configure the Switcher and the System Configure the switcher MLS Switcher Configuration programGlobal configurator software Installation Stage Five, cont’d Configure the system Global ConfiguratorLoosen all pivot screws and adjust the vertical angle 3c Check that an image is present, adjust as neededTest the system Final installation Adjust the configuration as necessaryWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationOptional Accessory Installation VoiceLift System Align the arrows on the housing rim and the dome tabAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOptional Accessory Installation Priority Page Sensor Kit Open the sensor and loop a wire around the sensorPriority Page Sensor Kit included parts UL-compliant junction box and coverTesting and Adjustment Procedure Typical paging system with the PVS 305SA switcher4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Commands PVS 305SA specific symbol definitionsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West