Optional Accessory Installation — Priority Page Sensor Kit

The Priority Page Sensor Kit momentarily silences classroom audio whenever a page is made from a public address (PA) system.

For detailed information, refer to the Priority Page Sensor Kit Installation Instructions, supplied with the device.

NThe Priority Page Sensor works with traditional 25 V or 70 V and 4/8 ohm PA systems. It is not designed for, and may not work properly with, two-way intercoms or systems that are IP-based or use digital clocks.

Priority Page Sensor Kit included parts:

Priority Page Sensor

UL-compliant junction box with a cable clamp and a lid

35 ft. (10.7 m) of sensor cable

Installation Procedure

WAll structural steps, anchoring, and electrical installation should be performed by qualified personnel in accordance with local and national building codes, fire and safety codes, and/or local and national electrical codes.

To meet the plenum rating requirement, the Priority Page Sensor assembly must be installed in a UL-compliant junction box with a cover and all cables to and from the sensor must be plenum rated.

1. Choose a suitable location for the sensor. It must be located near, and in series with, the speakers.

2. If the sensor is to be located in a plenum space, the junction box (provided) can be used. Knock out an opening at one end of the junction box and attach the cable clamp (see figure at right). Secure the box where the sensor will go.

3. Disconnect the PA system speaker cable from the speaker.

Remove the outer protective jacket from the speaker cable to expose the two speaker wires from the sensor to the speaker (as shown at right). Do not remove the inner protective jackets that cover the individual wires.

If the sensor is to be located in a plenum space, feed a loop of one of the exposed speaker wires through the cable clamp into the junction box. The other wire must bypass the sensor to be connected later directly to the speaker.

2UL-compliant junction box and cover

Open the

Page Sensor

4.Open the top of the Priority Page Sensor and loop the speaker wire that is inside the junction box tightly around the top part of the sensor.

NLoop only one of the speaker wires around the sensor cover. Do not loop both wires. Polarity need not be observed.

The other speaker wire must bypass the sensor and connect directly to the speaker.

For a 25 V or 70 V system, wrap 5 to 8 loops.

For a 4/8 ohm system, wrap 2 to 4 loops.

Speaker Cable with Plenum Jacket Intact

Strip plenum jacket from speaker cable to reveal two speaker wires.

Priority

Page

Sensor

Ceiling Mounted

Paging Speaker

4Open the sensor and loop a wire around the sensor

3-2 PoleVault Systems Installation • Optional Accessory Installation

Image 40
Contents Installation Guide PoleVault SystemsPrecautions Safety Instructions EnglishConsignes de Sécurité Français Sicherheitsanleitungen DeutschIntroduction PoleVault Systems Installation IntroductionFCC Class B Notice PoleVault System installation and wiring overview Introduction, contdTypical classroom installation PoleVault Systems Installation Introduction PlanningRoom layout RoomExample classroom installation Introduction Planning, cont’dLocation of the screen and projector ADA overhead and side clearance requirementsExample classroom with four speaker installation Location of MediaLink Controller and Wall PlatesLocation of source devices Cabling obstaclesInventory Introduction Inventory OverviewIncluded items PoleVault System Devices and Hardware, cont’d Introduction Inventory Overview, cont’d Optional installation hardwareItems not included Installation tools Outline of installation steps Installation OverviewPoleVault Systems Installation Installation Stage One Install the Screen and Projector PoleVault Systems Installation Installation StagePCM 340 Projector Drop Ceiling Mount Slotted Pipe Supplied with PCMInstallation Stage One, cont’d Install projector to verify locationMark screen location 1a Mark the screen location2f Slide and lock the projector onto the adjuster plate Verify the image location2e Attach the bracket to the projector Horizontal offsetPreliminary safety hardware installation 5a Mark structural ceiling for lag eye bolt installationCut the ceiling tile 4b Take measurements with the PCM 340 on the T-frameFinish Projector Drop Ceiling Mount installation Secure the Projector Drop Ceiling Mount to the ceiling7a Attach turnbuckles at the corners 7c Hand tighten the turnbucklesInstall the Screen Install the electrical box if required8a Install Raco box and plaster ring This stage involves installing the devices shown below Stage Two Install the Wall Plates and MLC 104 IP PlusMLC 104 IP Plus MediaLink Controller Installation Stage Two, cont’d CablesIR/RS-232 communications cable control cable RS-232 or to an IR emitterInstall the mud rings 1d Features for mud ring installationMLC 104 IP Plus mud ring 1c Insert the mud ringPull the cables at the input locations Signal Cable Label color2c Pull the cables at each location Install wall plates MLC 104 IP Plus controllerWire stripping lengths Install MediaLink Controller4a Connecting the MLC to the switcher 4c Connect to the LAN using a CAT 5 cable Connect the MLC to the projector withAn RS-232 cable or IR emitter cable, as AppropriateConnections made to the MLC 104 IP Plus 4e Secure the MLC 104 IP Plus to the mud ringStage Three Install the FF 120 Ceiling Speakers FF 120 Flat Field Ceiling SpeakersInstallation Stage Three, cont’d Install the speaker on the drop ceiling2h Attach safety cable Cut ceiling tileTerminate the speaker cable for the PVS switcher Pole captive screw connectorStereo or dual mono output using parallel speaker wiring To terminate the cable, strip the end of the cable 0.2 inchStage Four Install the PMK 550 and the PVS 305SA This stage covers installing the devices shown belowPVS 305SA PoleVault Switcher PMK 550 Pole Mount KitInstall the PMK 550 base plate PoleVault Systems Installation Installation Stage 4Installation Stage Four, cont’d Pull the cables at the switcher locationSwitcher and projector cable overview 2b Gather the cables, pass them down the pipeFinish installing the Pole Mount kit BControl/power cable from the MLC 104 IP Plus4a Connect the cables to the switcher Connect the cables as follows to the PVS 305SA4b Reattach UPB bracket and 4c projector 4d Cable the projectorConfigure the switcher MLS Switcher Configuration program Stage Five Configure the Switcher and the SystemGlobal configurator software Installation Stage Five, cont’d Configure the system Global Configurator3c Check that an image is present, adjust as needed Loosen all pivot screws and adjust the vertical angleTest the system Final installation Adjust the configuration as necessaryWhere installed, if necessary, adjust the sensitivity 3d Test the MLC configurationOptional Accessory Installation VoiceLift System Align the arrows on the housing rim and the dome tabAttach the Z bracket to the ceiling tile and the back plate Plug VoiceLift cable into PVS 305SAOptional Accessory Installation Priority Page Sensor Kit Open the sensor and loop a wire around the sensorPriority Page Sensor Kit included parts UL-compliant junction box and coverTypical paging system with the PVS 305SA switcher Testing and Adjustment Procedure4 Sensitivity knob adjustment PoleVault Systems Installation Reference Information Reference InformationWall or furniture mountable with included Decora wall plate Lbs 0.1 kgReference Information, cont’d Extron PCMSIS Commands PVS 305SA specific symbol definitionsSIS Command/Response Table Ascii Telnet PoleVault Systems Installation Basic SIS CommandsExtron USA West